<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>All Archives - SP Broadway</title>
	<atom:link href="https://www.spbroadway.com/case-studies/all/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.spbroadway.com/case-studies/all/</link>
	<description>Planning &#38; Development PR</description>
	<lastBuildDate>Wed, 24 Sep 2025 17:21:01 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://www.spbroadway.com/wp-content/uploads/2015/12/logo-150x103.jpg</url>
	<title>All Archives - SP Broadway</title>
	<link>https://www.spbroadway.com/case-studies/all/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>44 homes</title>
		<link>https://www.spbroadway.com/case_studies/44-homes/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 24 Sep 2025 17:07:14 +0000</pubDate>
				<guid isPermaLink="false">https://www.spbroadway.com/?post_type=case_studies&#038;p=41398</guid>

					<description><![CDATA[<p>Background Our client sought planning permission for up to 44 new homes (including 13 affordable homes) on a brownfield site opposite Hungerford Railway Station, on the M4 corridor in West Berkshire. The site was derelict, cleared and unoccupied, and had been subject to various failed planning applications previously. Challenge The site had a chequered planning &#8230; <a href="https://www.spbroadway.com/case_studies/44-homes/" class="more-link">Continue reading<span class="screen-reader-text"> "44 homes"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/44-homes/">44 homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>Background</strong></p>
<p>Our client sought planning permission for up to 44 new homes (including 13 affordable homes) on a brownfield site opposite Hungerford Railway Station, on the M4 corridor in West Berkshire. The site was derelict, cleared and unoccupied, and had been subject to various failed planning applications previously.</p>
<p><strong>Challenge</strong></p>
<p>The site had a chequered planning history, so it was important to explain our scheme and build support from the bottom up via political and community meetings and public consultation.</p>
<p><strong>Solution</strong></p>
<ul>
<li>We held several pre-application meetings with officers, ward councillors, the Chairman of the Town Council’s Environment and Planning Committee, the Mayor and the Cabinet Member for Planning on West Berkshire Council, all of whom were supportive of regenerating the unattractive and redundant site but highlighted parking, height, sustainability and density as areas of concern.</li>
</ul>
<ul>
<li>We held an online consultation which ran for a month, informing residents by posting a notification letter to 456 neighbouring addresses.</li>
</ul>
<ul>
<li>Approximately 19 residents submitted written feedback by the end of the consultation, with key concerns repeatedly raised around parking, height, and density.</li>
</ul>
<ul>
<li>To build support for the proposals we made a presentation and answered questions at the Town Council’s Environment and Planning Committee. Community consultation and feedback from the Town Council and neighbours allowed the project team to understand the views of residents and amend the scheme accordingly improving the layout and landscaping.</li>
</ul>
<ul>
<li>SP Broadway compiled a Statement of Community Involvement outlining the process of engagement which was submitted in conjunction with the planning application.</li>
</ul>
<p><strong>Result</strong></p>
<p>With little negative feedback from the consultation, and all key stakeholders aware of the scheme and briefed, the scheme was consented via delegated decision.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/44-homes/">44 homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>150 low carbon homes</title>
		<link>https://www.spbroadway.com/case_studies/150-low-carbon-homes/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 09 Jul 2024 09:55:21 +0000</pubDate>
				<guid isPermaLink="false">https://www.spbroadway.com/?post_type=case_studies&#038;p=41191</guid>

					<description><![CDATA[<p>Background Our client sought planning permission for up to 150 low-carbon sustainable new homes alongside new parkland and football pitches in Chesterton, on the edge of Bicester in Oxfordshire, within a council area which graduated from Conservative to no overall control during the planning timescale. Challenge Our clients undertook various pre-app meetings with Cherwell District &#8230; <a href="https://www.spbroadway.com/case_studies/150-low-carbon-homes/" class="more-link">Continue reading<span class="screen-reader-text"> "150 low carbon homes"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/150-low-carbon-homes/">150 low carbon homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>Background</strong></p>
<p>Our client sought planning permission for up to 150 low-carbon sustainable new homes alongside new parkland and football pitches in Chesterton, on the edge of Bicester in Oxfordshire, within a council area which graduated from Conservative to no overall control during the planning timescale.</p>
<p><strong>Challenge</strong></p>
<p>Our clients undertook various pre-app meetings with Cherwell District Council who were supportive, albeit this did not translate in the paperwork. Drainage was highlighted as a technical issue and Chesterton was a category A village with no neighbourhood plan. Nearby a new sports centre and US led Great Wolf Resort were approved on appeal.</p>
<p><strong>Solution </strong></p>
<ul>
<li>SP Broadway met with residents and political / community leaders to communicate a positive vision for the new homes, new parkland and football pitches being proposed, and to understand local views in light of extensive other development in the local area, just off the M40 Oxford-Birmingham corridor.</li>
<li>SP Broadway organised a public exhibition for residents, which was attended by approximately 72 people, including two Parish councillors. The key points that repeatedly came up in the feedback included pavements and walking, provision of a village shop, roads, primary school places, cycle lanes and public transport. We also created a website to invite online feedback.</li>
<li>We informed residents of the public exhibition and online consultation by posting a notification letter to 437 addresses in the immediate vicinity after discussions with officers and ward members on the radius of invitees.</li>
<li>To build support for the proposals, we met with the Chairman of Chesterton Football Club. Discussions were positive and the Chairman highlighted that further improvements to the Pavilion, parking spaces, football pitches and a potential tennis court would be beneficial to the local community, and likely help build support.</li>
<li>SP Broadway compiled a Statement of Community Involvement outlining the process of engagement which was submitted in conjunction with the planning application.</li>
</ul>
<p><strong>Result</strong></p>
<p>A planning application was submitted on 16th January 2023. The application was refused in July 2023. Subsequently, an appeal was submitted, and planning permission was granted in May 2024, the Inspector agreed the new homes were in compliance with the development plan, and ‘material considerations’ did not indicate the Inspector should decide other than in accordance with the development plan.</p>
<p>&nbsp;</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/150-low-carbon-homes/">150 low carbon homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>75 homes (change-of-use)</title>
		<link>https://www.spbroadway.com/case_studies/employment-to-residential/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 29 Sep 2023 15:09:54 +0000</pubDate>
				<guid isPermaLink="false">https://www.spbroadway.com/?post_type=case_studies&#038;p=40973</guid>

					<description><![CDATA[<p>Background After 2 years of marketing land on the edge of Witney that had previously been consented for employment use (offices and a hotel), and failing to attract offers, our client required assistance for a change-of-use application to provide 75 new homes.  The District Council opposed the proposed change-of-use, considering the land ‘de facto employment &#8230; <a href="https://www.spbroadway.com/case_studies/employment-to-residential/" class="more-link">Continue reading<span class="screen-reader-text"> "75 homes (change-of-use)"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/employment-to-residential/">75 homes (change-of-use)</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>Background</strong></p>
<p>After 2 years of marketing land on the edge of Witney that had previously been consented for employment use (offices and a hotel), and failing to attract offers, our client required assistance for a change-of-use application to provide 75 new homes.  The District Council opposed the proposed change-of-use, considering the land ‘de facto employment land’ despite the lack of commercial interest.</p>
<p><strong>Challenge</strong></p>
<p>The District Council believed that since the land had previously been consented for employment use (albeit five years before), it should remain solely reserved for employment use.</p>
<p><strong>Solution</strong></p>
<ul>
<li>SP Broadway undertook a campaign to explain the advantages of the change-of-use to key political stakeholders.  We gained a motion of support from the local Parish Council, which agreed that it <em>‘does not seem logical’</em> to retain the land for employment.  We also received the approval of the local ward member, who said the scheme was <em>‘easy to support’</em>.</li>
</ul>
<ul>
<li>We sought input from the public regarding potential community facilities or projects that could be funded from developer contributions.</li>
</ul>
<ul>
<li>We initiated a ‘door to door’ neighbourhood petition aimed at informing residents about the advantages and feasibility of new homes.  The planning application included 40% affordable housing, improvements to public green spaces and children&#8217;s play areas, as well as the developer&#8217;s commitment to financially supporting a community-driven project.</li>
</ul>
<p><strong>Result</strong></p>
<ul>
<li>Although ward members were sympathetic to the change-of-use, the District Council’s officers refused the change-of-use application in March 2022 using delegated powers.</li>
</ul>
<ul>
<li>Our client appealed the delegated refusal, and the inspector allowed the appeal.  The inspector noted that the proposal <em>‘would support economic growth through direct and indirect jobs and investment’</em>, agreed that there were no grounds for the District Council’s initial claim that the site was ‘de facto employment land’, and highlighted that the council could only demonstrate a 3.5 year housing supply.</li>
</ul>
<p>The post <a href="https://www.spbroadway.com/case_studies/employment-to-residential/">75 homes (change-of-use)</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Service area</title>
		<link>https://www.spbroadway.com/case_studies/service-area/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 14 Jul 2023 17:31:21 +0000</pubDate>
				<guid isPermaLink="false">https://www.spbroadway.com/?post_type=case_studies&#038;p=40892</guid>

					<description><![CDATA[<p>Background Our client sought to bring forward proposals for a service area off the A34 at Chilton, Oxfordshire, compromising of a petrol filling station, electric vehicle charging points, parking, retail and a food and drink outlet. The proposed site was ideally located for such a development &#8211; a small triangle of farmland cut off by &#8230; <a href="https://www.spbroadway.com/case_studies/service-area/" class="more-link">Continue reading<span class="screen-reader-text"> "Service area"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/service-area/">Service area</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>Background</strong></p>
<p>Our client sought to bring forward proposals for a service area off the A34 at Chilton, Oxfordshire, compromising of a petrol filling station, electric vehicle charging points, parking, retail and a food and drink outlet. The proposed site was ideally located for such a development &#8211; a small triangle of farmland cut off by highways upgrades at the Chilton A34 junction, located on a stretch of the A34 with no northbound services for 40 miles.</p>
<p><strong>Challenge</strong></p>
<ul>
<li>The site was within the North Wessex Downs Area of Outstanding Natural Beauty (AONB), and officers were concerned the proposals constituted ‘major development’ in the AONB.</li>
</ul>
<ul>
<li>Additional concerns were raised that the scheme would generate a significant level of increased traffic at the interchange, and poor sightlines on the northbound slip road.</li>
</ul>
<p><strong>Solution</strong></p>
<ul>
<li>We launched a community consultation website outlining the proposals and providing our contact details for residents and stakeholders to direct enquiries and comments.</li>
</ul>
<ul>
<li>We sent out a detailed briefing letter to nearly 800 local residents and businesses, directing them to visit the consultation website and leave feedback, receiving almost 90 positive responses.</li>
</ul>
<ul>
<li>We arranged a series of meetings with stakeholders, including the site ward councillor, the Oxfordshire County Councillor, the Parish Council and neighbouring Parish Council, as well as the Harwell Campus and neighbouring businesses. The ward councillor proved extremely supportive, and agreed to call the application in to Planning Committee.</li>
</ul>
<ul>
<li>Crucially, we organised a series of meetings with the North Wessex Downs AONB Board, which culminated in the Board writing to Vale of White Horse District Council supporting our stance that the proposals did not constitute ‘major development’.</li>
</ul>
<ul>
<li>SP Broadway arranged a meeting with the site’s Member of Parliament, who supported the proposals and wrote to Vale of White Horse District Council urging them to consent the application.</li>
</ul>
<p><strong>Result</strong></p>
<p>The application went before the first Planning Committee after local elections, where the Conservatives had lost their majority to the Liberal Democrats, who did not share the previous administration’s enthusiasm for the Service Area and refused the application.  An appeal was subsequently submitted to the Planning Inspectorate.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/service-area/">Service area</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>100 homes</title>
		<link>https://www.spbroadway.com/case_studies/100-homes/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 14 Jul 2023 17:05:32 +0000</pubDate>
				<guid isPermaLink="false">https://www.spbroadway.com/?post_type=case_studies&#038;p=40889</guid>

					<description><![CDATA[<p>Background Our client had a draft allocation for 26 new homes in the draft South Worcestershire Development Plan (SWDP) Review.  However, they were seeking to submit a planning application for an additional 75 homes on land to the north of the allocation site. Challenge SP Broadway had to meet with residents and political community leaders &#8230; <a href="https://www.spbroadway.com/case_studies/100-homes/" class="more-link">Continue reading<span class="screen-reader-text"> "100 homes"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/100-homes/">100 homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>Background</strong></p>
<p>Our client had a draft allocation for 26 new homes in the draft South Worcestershire Development Plan (SWDP) Review.  However, they were seeking to submit a planning application for an additional 75 homes on land to the north of the allocation site.</p>
<p><strong>Challenge</strong></p>
<p>SP Broadway had to meet with residents and political community leaders to communicate a positive vision for the additional homes that were being proposed, and to understand local views.</p>
<p><strong>Solution</strong></p>
<ul>
<li>We organised a public exhibition for residents, which was attended by approximately 250 people. Residents raised concerns over the impact of the development on traffic, the environment, a Grade 2 listed bridge, and local services.</li>
</ul>
<ul>
<li>We informed residents of the public exhibition and online consultation by posting a notification letter to 359 addresses.  We also created a website to enable online feedback.</li>
</ul>
<ul>
<li>To build awareness of the scheme, we met with the local ward member on Wychavon District Council.  Topics discussed included the lack of parking in the village, the views of residents, and the need for more clarity concerning the EIA screening process.</li>
</ul>
<ul>
<li>In response to community concerns, various changes were made to the proposals, including replacing sports pitches with a wildflower meadow, and increasing the buffer zone alongside existing homes.</li>
</ul>
<p><strong>Result</strong></p>
<p>A planning application was submitted; however, the council failed to determine the application in time. An appeal was submitted on grounds of non-determination, and is currently ongoing.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/100-homes/">100 homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>141-bed care home</title>
		<link>https://www.spbroadway.com/case_studies/141-bed-care-home/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 21 Mar 2023 17:03:38 +0000</pubDate>
				<guid isPermaLink="false">https://www.spbroadway.com/?post_type=case_studies&#038;p=40152</guid>

					<description><![CDATA[<p>Background Our client sought planning permission to build two separate specialist care home facilities just outside Southampton: a nursing home with dementia care provision, and a specialist neurorehabilitation centre. Challenges The land was allocated in the Local Plan for a different use. The proposals had been recommended for refusal by officers due to a number &#8230; <a href="https://www.spbroadway.com/case_studies/141-bed-care-home/" class="more-link">Continue reading<span class="screen-reader-text"> "141-bed care home"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/141-bed-care-home/">141-bed care home</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>Background</strong></p>
<p>Our client sought planning permission to build two separate specialist care home facilities just outside Southampton: a nursing home with dementia care provision, and a specialist neurorehabilitation centre.</p>
<p><strong>Challenges</strong></p>
<ul>
<li>The land was allocated in the Local Plan for a different use.</li>
</ul>
<ul>
<li>The proposals had been recommended for refusal by officers due to a number of factors, including objections to the proposed design and building height.</li>
</ul>
<ul>
<li>The site proposals were opposed by the local Parish Council and ward councillors &#8211; two of whom were also members of the Planning Committee.</li>
</ul>
<p><strong>Solution</strong></p>
<ul>
<li>SP Broadway contacted all key stakeholders, including the county councillor and the Member of Parliament.</li>
</ul>
<ul>
<li>Through our contact with the Cabinet Member for Planning we facilitated a meeting with planning officers and the project team to address the reasons the scheme had been initially recommended for refusal. These included the scheme’s design and the fact that the proposed site was allocated as employment land in the council’s Local Plan.</li>
</ul>
<ul>
<li>Following this meeting, the planning application was granted an extension of time to address some technical issues, which eventually resulted in the proposals receiving a recommendation to approve from planning officers. SP Broadway wrote a briefing letter to members of the Planning Committee to make sure they were aware of these technical challenges and to maintain the profile of the proposals.</li>
</ul>
<ul>
<li>Ahead of the Planning Committee, SP Broadway circulated a second briefing letter to all committee members, highlighting the many benefits it would bring to the borough.  On the eve of committee, we called members of the Planning Committee to ensure they had read the letter and to answer any last-minute questions.</li>
</ul>
<p><strong>Result</strong></p>
<p>The proposals went before the Planning Committee and were unanimously consented by members, including the two local ward councillors.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/141-bed-care-home/">141-bed care home</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Life sciences campus</title>
		<link>https://www.spbroadway.com/case_studies/life-sciences-campus/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 24 Jan 2023 16:50:18 +0000</pubDate>
				<guid isPermaLink="false">https://www.spbroadway.com/?post_type=case_studies&#038;p=38215</guid>

					<description><![CDATA[<p>Background A privately owned property company formed in 1993 with offices in Cambridge and London brought us on board to understand political views and gain support ahead of submitting a planning application for the redevelopment of a former gasworks on the edge of the city of Oxford, into flexible use life sciences, R&#38;D, light or &#8230; <a href="https://www.spbroadway.com/case_studies/life-sciences-campus/" class="more-link">Continue reading<span class="screen-reader-text"> "Life sciences campus"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/life-sciences-campus/">Life sciences campus</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>Background</strong></p>
<p>A privately owned property company formed in 1993 with offices in Cambridge and London brought us on board to understand political views and gain support ahead of submitting a planning application for the redevelopment of a former gasworks on the edge of the city of Oxford, into flexible use life sciences, R&amp;D, light or general industrial space in the Ox Cam Arc.</p>
<p><strong>Challenge</strong></p>
<p>Although the site was brownfield, which made it more straightforward than greenfield, we anticipated highways to be a prominent issue with residents and councillors, particularly in light of a residential development to the east of the site. In addition, the site was on the outer edge of the city of Oxford, hard up against the South Oxfordshire District Council Green Belt.</p>
<p><strong>Solution</strong></p>
<ul>
<li>SP Broadway facilitated discussions with a range of political stakeholders in order to build support ahead of the formal submission of a planning application.</li>
</ul>
<ul>
<li>Meetings were offered to Blackbird Leys Ward members, Blackbird Leys Parish Council, the chair of Oxford City Council Planning Committee, the Cabinet Member for Planning and the Chief Executive of the Oxfordshire LEP.</li>
</ul>
<ul>
<li>Meetings covered a range of issues including design, economic benefits, employment, traffic and access, ecology, landscaping and how the development could help Oxford’s life sciences sector and address the shortage of buildings suitable for R&amp;D/ life sciences across the wider Ox Cam Arc.</li>
</ul>
<p><strong>Result</strong></p>
<p>After understanding key political concerns and support, the client submitted the planning application to Oxford City Council. Officers gave a recommendation of support, and the employment led scheme subsequently received unanimous support at planning committee and will be a great edition to the Oxford fringe life sciences space, and the wider OxCam Arc.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/life-sciences-campus/">Life sciences campus</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Cemetery extension</title>
		<link>https://www.spbroadway.com/case_studies/cemetery-extension/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 21 Dec 2022 14:29:09 +0000</pubDate>
				<guid isPermaLink="false">https://www.spbroadway.com/?post_type=case_studies&#038;p=36769</guid>

					<description><![CDATA[<p>Background Our client sought to bring forward proposals for an extension to a cemetery in the London Borough of Bromley.  The proposal included additional gravestones, associated landscaping and tree removal, an extension to a road, pavements, a wooden lodge containing offices and new toilet facilities; cumulatively all these had caused concern amongst residents and the &#8230; <a href="https://www.spbroadway.com/case_studies/cemetery-extension/" class="more-link">Continue reading<span class="screen-reader-text"> "Cemetery extension"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/cemetery-extension/">Cemetery extension</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>Background</strong></p>
<p>Our client sought to bring forward proposals for an extension to a cemetery in the London Borough of Bromley.  The proposal included additional gravestones, associated landscaping and tree removal, an extension to a road, pavements, a wooden lodge containing offices and new toilet facilities; cumulatively all these had caused concern amongst residents and the local civic society, feeding through to officers and members.</p>
<p><strong>Challenge</strong></p>
<p>The Bromley Local Plan designated the cemetery as a Conservation Area and a Site of Importance for Nature Conservation. The cemetery also lay within the Green Belt and therefore clearing woodland to make room for additional graves proved to be controversial with residents and conservation groups. Increased traffic, access and disruption resulting from additional funeral services were some of the additional sources of concern. SP Broadway was brought on board to gain a full understanding of officer and councillor concerns, to explain the plans to local stakeholders and to bring all parties together ahead of the submission of the planning application.</p>
<p><strong>Solution</strong></p>
<ul>
<li>SP Broadway facilitated meetings between the cemetery and a range of key stakeholders, including ward councillors and the local civic society, in order to hear their views on the proposed cemetery extension and discuss solutions.</li>
</ul>
<ul>
<li>The civic society was particularly interested in protecting trees, and the possibility of rewilding parts of the cemetery was discussed.</li>
</ul>
<ul>
<li>Elected councillors were given a guided tour of the existing cemetery, which included presenting the revised cemetery masterplan, understanding the extent of tree loss/new tree planting and new access arrangements.</li>
</ul>
<p><strong>Result</strong></p>
<p>Once ward councillors and civic leaders’ concerns had been addressed, officers felt able to bring the scheme through planning.   Bromley Council Planning Committee voted to approve the proposals by six votes to three.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/cemetery-extension/">Cemetery extension</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>60-bed care home</title>
		<link>https://www.spbroadway.com/case_studies/60-bed-care-home/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 21 Dec 2022 14:12:49 +0000</pubDate>
				<guid isPermaLink="false">https://www.spbroadway.com/?post_type=case_studies&#038;p=36767</guid>

					<description><![CDATA[<p>Background Carebase sought planning permission for a 60-bed care home on the site of a disused bowls club on the outskirts of Hayes, in the London Borough of Bromley. Challenge Though previously-developed land, the site was designated Urban Open Land, with protected status similar to Green Belt.  The site was also immediately adjacent to an &#8230; <a href="https://www.spbroadway.com/case_studies/60-bed-care-home/" class="more-link">Continue reading<span class="screen-reader-text"> "60-bed care home"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/60-bed-care-home/">60-bed care home</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>Background</strong></p>
<p>Carebase sought planning permission for a 60-bed care home on the site of a disused bowls club on the outskirts of Hayes, in the London Borough of Bromley.</p>
<p><strong>Challenge</strong></p>
<p>Though previously-developed land, the site was designated Urban Open Land, with protected status similar to Green Belt.  The site was also immediately adjacent to an apartment block whose residents vigorously opposed the site’s development.</p>
<p><strong>Solution </strong></p>
<ul>
<li>SP Broadway organised meetings for Carebase with the three Bromley Council members for Hayes ward, and with the Hayes Village Association. These meetings quickly established that key local stakeholders were opposed to the proposals.</li>
</ul>
<ul>
<li>We organised a public exhibition in the Village Hall, sending individual invitation letters to over 800 addresses in Hayes. Despite this, turnout at the exhibition was low – only 70 attendees – and feedback was mixed.</li>
</ul>
<ul>
<li>With limited engagement from the Hayes ward members, we opened up a useful channel of communication with the Cabinet Member for Planning on Bromley Council, who proved a helpful source of advice on further engagement.</li>
</ul>
<ul>
<li>At the urging of the Cabinet Member for Planning, Carebase entered into discussions with the Adult Social Care team on Bromley Council, and agreement was reached on council nomination rights for ten beds in the proposed facility.</li>
</ul>
<ul>
<li>In the run-up to determination, we undertook a door-knocking exercise in the hope of detecting wider public support within Hayes for the proposed facility. A total of 44 residents were happy to fill in a form indicating their support and post the form to Bromley Council Planning Department.</li>
</ul>
<ul>
<li>In the week before the Development Control Committee meeting, we sent a brochure and detailed covering letter to every member of the committee summarising the proposals and extolling their benefits. Follow-up calls indicated that was some support for the facility on the committee.</li>
</ul>
<p><strong>Result</strong></p>
<p>Despite a recommendation for approval, Bromley Council Development Control Committee voted to refuse Carebase’s application, despite support from some committee members.  Carebase appealed the decision, and the appeal was allowed.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/60-bed-care-home/">60-bed care home</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>New supermarket</title>
		<link>https://www.spbroadway.com/case_studies/new-supermarket/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Thu, 21 Oct 2021 09:34:37 +0000</pubDate>
				<guid isPermaLink="false">https://www.spbroadway.com/?post_type=case_studies&#038;p=4513</guid>

					<description><![CDATA[<p>Background Lidl sought planning permission for a new 20,450 sq. ft food store on a business park site south of Horsham that had already received outline planning permission for business and trade park units. SP Broadway were instructed to organise an online consultation for the Lidl food store ahead of submission of a planning application. &#8230; <a href="https://www.spbroadway.com/case_studies/new-supermarket/" class="more-link">Continue reading<span class="screen-reader-text"> "New supermarket"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/new-supermarket/">New supermarket</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>Background</strong></p>
<p>Lidl sought planning permission for a new 20,450 sq. ft food store on a business park site south of Horsham that had already received outline planning permission for business and trade park units. SP Broadway were instructed to organise an online consultation for the Lidl food store ahead of submission of a planning application.</p>
<p><strong>Challenge</strong></p>
<p>The challenge was to communicate to residents and the Parish Council the benefits of the Lidl supermarket and encourage their support as the scheme was being considered by officers and ultimately elected members.</p>
<p><strong>Solution</strong></p>
<ul>
<li>We had regularly updated the Parish Council on the build-out progress of the wider business park, and notified parish and ward councillors ahead of our online consultation (due to COVID- 19 restrictions) for the new Lidl food store.</li>
<li>We launched a consultation website detailing the Lidl proposals and invited feedback from village residents.</li>
<li>We uploaded a community leaflet onto the consultation website. We received over 337 online feedback forms, 312 responders (93%) supporting the principle of a new Lidl food store as an affordable alternative to other supermarkets that would prevent them having to leave the village to shop and would support a rising population.</li>
</ul>
<p><strong>Result</strong></p>
<p>SP Broadway gained the support of the Parish Council and the local community with 93% of residents&#8217; comments in favour of a new Lidl food store. With officers content, the planning application was approved by delegated decision.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/new-supermarket/">New supermarket</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>250 homes</title>
		<link>https://www.spbroadway.com/case_studies/250-homes/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 06 Jul 2021 16:14:50 +0000</pubDate>
				<guid isPermaLink="false">https://www.spbroadway.com/?post_type=case_studies&#038;p=4365</guid>

					<description><![CDATA[<p>Background Spitfire Bespoke Homes sought to gain 1) a Local Plan allocation for new homes on Dunstall Farm, a plot of agricultural land on the southern edge of Moreton-in-Marsh in Gloucestershire, and 2) a detailed planning consent for 250 homes. Challenge Over the preceding five years Cotswold District Council had consented a considerable amount of &#8230; <a href="https://www.spbroadway.com/case_studies/250-homes/" class="more-link">Continue reading<span class="screen-reader-text"> "250 homes"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/250-homes/">250 homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>Spitfire Bespoke Homes sought to gain 1) a Local Plan allocation for new homes on Dunstall Farm, a plot of agricultural land on the southern edge of Moreton-in-Marsh in Gloucestershire, and 2) a detailed planning consent for 250 homes.</p>
<h2>Challenge</h2>
<p>Over the preceding five years Cotswold District Council had consented a considerable amount of development in the town, including three new large developments. Reaction to this development had been largely negative from the local community and politicians, with the local MP and councillors condemning them as unsustainable. In January 2015 Cotswold District Council published its Development Strategy and Site Allocations document, which determined that only one site of 21 homes was to be allocated in Moreton-in-Marsh in the new Local Plan period.</p>
<h2>Solution</h2>
<ul>
<li>SP Broadway organised strategic meetings with key local community and political figures including the Town Council and the local MP. This allowed us to understand the positions of key stakeholders and provided us with an early opportunity to highlight the benefits of the proposals.</li>
</ul>
<ul>
<li>We held two public exhibitions showcasing the plans, with members of the project team on hand to answer any queries and explain the benefits the development could bring to the town. To demonstrate our client’s commitment to community consultation, we invited all local residents within a broad radius of the site and all local political and community stakeholder groups.</li>
</ul>
<ul>
<li>We organised a Community Working Group, inviting selected residents and town &amp; district councillors to discuss the evolving masterplan for the site in greater detail. The Working Group met a total of eight times over six months.</li>
</ul>
<ul>
<li>Despite an initial lack of political support for the proposals, as a result of our political and community engagement the site was allocated for 119 homes in Cotswold District Council’s Local Plan.</li>
</ul>
<ul>
<li>Having secured the draft allocation, it was decided to bring forward a planning application. A third public exhibition was held and a detailed planning application for 250 homes was submitted.</li>
</ul>
<ul>
<li>At a Planning Committee meeting, members resolved to defer the application in order to secure greater certainty on the scheme’s contribution towards primary education in Moreton-in-Marsh. We organised a meeting with the ward member for the site – a Planning Committee member – to discuss this issue in greater detail, and sent a letter to all Planning Committee members clarifying Spitfire’s position on this issue.</li>
</ul>
<h2>Result</h2>
<p>Spitfire’s detailed planning application for 250 homes was consented by Cotswold District Council Planning Committee.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/250-homes/">250 homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>New homes &#038; office space</title>
		<link>https://www.spbroadway.com/case_studies/new-homes-office-space/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 06 Jul 2021 16:06:46 +0000</pubDate>
				<guid isPermaLink="false">https://www.spbroadway.com/?post_type=case_studies&#038;p=4362</guid>

					<description><![CDATA[<p>Background Our client had lodged a planning application with SODC for 43 apartments and 221 sqm new office space on the site of light industrial and low-grade existing office space on Newtown Road, Henley on Thames. The site is located on a business park and had been marketed for commercial use for 18 months with &#8230; <a href="https://www.spbroadway.com/case_studies/new-homes-office-space/" class="more-link">Continue reading<span class="screen-reader-text"> "New homes &#038; office space"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/new-homes-office-space/">New homes &#038; office space</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>Our client had lodged a planning application with SODC for 43 apartments and 221 sqm new office space on the site of light industrial and low-grade existing office space on Newtown Road, Henley on Thames. The site is located on a business park and had been marketed for commercial use for 18 months with no interest and had been vacant for over 10 years.</p>
<h2>Challenge</h2>
<p>The adopted Henley Neighbourhood Plan designated the site for employment use only, with Henley Town Council objecting to the proposals on this basis. The local ward members, one of which sat on the Planning Committee, were also objecting on this basis.</p>
<h2>Solution</h2>
<p>SP Broadway were instructed a month before committee to undertake political engagement and to explain the advantages of a mixed-use regeneration of a brownfield site in this location. We drafted and prepared a briefing letter to Planning Committee members, highlighting the existing buildings were outdated and not in demand. This was followed up with telephone conversations to committee members highlighting 6 key advantages of the redevelopment:</p>
<ul>
<li>43 apartments in a sustainable location, 15 minutes’ walk from Henley station</li>
</ul>
<ul>
<li>221 sqm of brand-new office space, ideal for small businesses and start-ups</li>
</ul>
<ul>
<li>8 affordable apartments provided on-site on a shared ownership basis</li>
</ul>
<ul>
<li>High-quality, brand new homes instead of an office-to-residential conversion</li>
</ul>
<ul>
<li>Maintaining an employment use on-site instead of a wholly residential proposal</li>
</ul>
<ul>
<li>Bringing a vacant brownfield site back into a productive, mixed use</li>
</ul>
<h2>Result</h2>
<p>Despite objections from the Town Council and local ward members, the Planning Committee voted 6-2 in favour of the application, with 1 abstention.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/new-homes-office-space/">New homes &#038; office space</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>4,254 homes</title>
		<link>https://www.spbroadway.com/case_studies/4254-homes-2/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 03 Jan 2020 14:12:09 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=3376</guid>

					<description><![CDATA[<p>Background SP Broadway was instructed to assist a consortium of three national housebuilders with political engagement on an application for 4,254 homes on the western edge of Didcot, Oxfordshire. Challenge ▪ The site was not within the town boundary but in a neighbouring parish. The neighbouring parish council was concerned that this development would lead to &#8230; <a href="https://www.spbroadway.com/case_studies/4254-homes-2/" class="more-link">Continue reading<span class="screen-reader-text"> "4,254 homes"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/4254-homes-2/">4,254 homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong><span style="color: #000080;">Background</span> </strong></p>
<p>SP Broadway was instructed to assist a consortium of three national housebuilders with political engagement on an application for 4,254 homes on the western edge of Didcot, Oxfordshire.</p>
<p><span style="color: #000080;"><strong>Challenge</strong> </span></p>
<p>▪ The site was not within the town boundary but in a neighbouring parish. The neighbouring parish council was concerned that this development would lead to the effective coalescence of their village with Didcot.</p>
<p>▪ The site was allocated for 2,550 homes in the new Local Plan up to 2031, but the application sought outline consent for up to 4,254 homes beyond the Plan period to link to densities on schemes recently consented.</p>
<p><span style="color: #000080;"><strong>Solution</strong> </span></p>
<p>▪ Following a general election, full district and parish council elections and ward boundary changes, we compiled a comprehensive Political &amp; Community Stakeholder Survey identifying the elected members who would impact the planning application.</p>
<p>▪ Using the information gathered in the Survey we began monitoring of the Didcot Herald, Oxford Times and online media to keep the project team aware of what key stakeholders were saying publicly about the application and planning &amp; development issues in the area more widely.</p>
<p>▪ We attended two Development Forum meetings between the client, councillors and council officers, taking notes of councillor comments to understand their views on the proposals and ensure that our correspondence with planning committee members took these views into account.</p>
<p>▪ We drafted and sent two letters to planning committee members, one when the application was submitted in and the second the week before the application was determined. These letters stressed the changes that had been made to the proposals as a result of extensive consultation with the council &amp; other statutory bodies and explained what the homes brought to the community, including new schools, a leisure centre and 35% affordable housing.</p>
<p>▪ After sending the second letter we made calls to planning committee members to find out whether they had any questions about the application or required any further information ahead of the vote.</p>
<p><strong><span style="color: #000080;">Result</span> </strong></p>
<p>The application was approved unanimously by Vale of White Horse District Council Planning Committee.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/4254-homes-2/">4,254 homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>500,000 sq ft business park, petrol filling station and retail outlet</title>
		<link>https://www.spbroadway.com/case_studies/gsb/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 13 Dec 2019 16:03:53 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=3364</guid>

					<description><![CDATA[<p>Background Our client sought consent to provide a new business park on the edge of Billingshurst, south of Horsham in West Sussex with business units ranging from 290m² to 2,300m², a petrol filling station, ancillary retail units and a drivethru food offering. Challenge The land was not allocated for development in either the emerging Parish &#8230; <a href="https://www.spbroadway.com/case_studies/gsb/" class="more-link">Continue reading<span class="screen-reader-text"> "500,000 sq ft business park, petrol filling station and retail outlet"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/gsb/">500,000 sq ft business park, petrol filling station and retail outlet</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="color: #000080;"><strong>Background</strong></span></p>
<p>Our client sought consent to provide a new business park on the edge of Billingshurst, south of Horsham in West Sussex with business units ranging from 290m² to 2,300m², a petrol filling station, ancillary retail units and a drivethru food offering.</p>
<p><span style="color: #000080;"><strong>Challenge</strong></span></p>
<p>The land was not allocated for development in either the emerging Parish Neighbourhood Plan or Local Plan, there was concern that a development of this scale would impact the landscape, and was of a scale that was not needed.</p>
<p><span style="color: #000080;"><strong>Solution</strong></span></p>
<p>▪ We met the Parish Neighbourhood Plan Steering Group on a number of occasions to introduce the scheme and understand feedback from a key community stakeholder.</p>
<p>▪ We met with site ward members on two occasions. The first occasion was an opportunity to present the scheme and understand their views. The second meeting was an opportunity to update ward members on changes to the scheme as a result of the initial meeting.</p>
<p>▪ We arranged a pre-submission meeting with the Neighbourhood Plan Steering Group, to update members on the overall progress and final plans, at the meeting the Steering Group voted to support the scheme as there was a lack of local business space.</p>
<p>▪ As the application headed towards committee, we created a community consultation website, providing a link to the council planning portal which enabled residents and businesses to provide feedback on the application, and register support.</p>
<p>▪ We sent two briefing letters to planning committee members prior to committee, highlighting support from officers who accepted that there was an “undersupply” in the district and recommended approval. A central theme in SP Broadway’s communication with committee members was reiterating support from local businesses and Billingshurst &amp; Horsham Chamber of Commerce.</p>
<p><span style="color: #000080;"><strong>Result</strong> </span></p>
<p>The application was approved 17-1 by members at committee. Members who voted to consent the application included two of the three ward members, the Leader of the Council and Cabinet Member for Planning</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/gsb/">500,000 sq ft business park, petrol filling station and retail outlet</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>74 new homes and 425sqm retail</title>
		<link>https://www.spbroadway.com/case_studies/74-new-homes-and-425sqm-retail/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 25 Sep 2018 14:58:28 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=2600</guid>

					<description><![CDATA[<p>Background Our client was seeking to redevelop a tired parade of disused shops next to Addlestone railway station, providing a new flexible retail space and 74 apartments. Challenge Though the site had been allocated in the draft Runnymede Local Plan, there were concerns about the height of the proposed buildings. The site was next to &#8230; <a href="https://www.spbroadway.com/case_studies/74-new-homes-and-425sqm-retail/" class="more-link">Continue reading<span class="screen-reader-text"> "74 new homes and 425sqm retail"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/74-new-homes-and-425sqm-retail/">74 new homes and 425sqm retail</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="color: #1f4980;"><strong>Background</strong></span></p>
<p>Our client was seeking to redevelop a tired parade of disused shops next to Addlestone railway station, providing a new flexible retail space and 74 apartments.</p>
<p><span style="color: #1f4980;"><strong>Challenge</strong></span></p>
<ul>
<li>Though the site had been allocated in the draft Runnymede Local Plan, there were concerns about the height of the proposed buildings.</li>
</ul>
<ul>
<li>The site was next to a level crossing, which created considerable tailback during peak hours. As a result, the Council sought to minimise the number of parking spaces on site as part of a wider aim to deter car use, which residents did not agree was the right approach.</li>
</ul>
<ul>
<li>The site formed part of the entrance into Addlestone, and was seen by the Council as a potential landmark building which required a high-quality design. This created issues of viability, with members concerned about the reduction in affordable homes.</li>
</ul>
<p><span style="color: #1f4980;"><strong>Solution</strong></span></p>
<ul>
<li><strong> </strong>We supported the client, planning consultant, and architect with a presentation to Runnymede Borough Council Planning Committee.</li>
</ul>
<ul>
<li>SP Broadway organised a two-day public exhibition, and invited approximately 3,500 residents and stakeholders. The exhibition was held in one of the disused shops on the site, maximising the opportunity for local residents, commuters, and weekend visitors to the High Street to attend – this attracted a wider demographic, and the feedback received showed a majority of respondents supported the redevelopment.</li>
</ul>
<ul>
<li>We liaised closely with a local shop that had a strong Facebook following among Addlestone residents, sending them images of the proposals and informing them when the application had been submitted.</li>
</ul>
<p><span style="color: #1f4980;"><strong>Result</strong></span></p>
<p><strong> </strong>The Committee spoke very positively about the scheme, and its contribution to the regeneration of Addlestone. It was approved by 12 votes to 1, subject to an agreement on the affordable housing provision with officers.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/74-new-homes-and-425sqm-retail/">74 new homes and 425sqm retail</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>94 new homes</title>
		<link>https://www.spbroadway.com/case_studies/94-new-homes/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 15 Aug 2018 12:35:05 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=2564</guid>

					<description><![CDATA[<p>Background A national housebuilder sought planning permission for 94 new homes on the site of a former garden centre in the village of Badshot Lea, Surrey. Challenge The site had outline planning permission for 80 homes, but that application did not include a &#8216;ransom strip&#8217; of land through the centre of the site.  Our client had since &#8230; <a href="https://www.spbroadway.com/case_studies/94-new-homes/" class="more-link">Continue reading<span class="screen-reader-text"> "94 new homes"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/94-new-homes/">94 new homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>A national housebuilder sought planning permission for 94 new homes on the site of a former garden centre in the village of Badshot Lea, Surrey.</p>
<h2>Challenge</h2>
<p>The site had outline planning permission for 80 homes, but that application did not include a &#8216;ransom strip&#8217; of land through the centre of the site.  Our client had since acquired the strip and an entirely new application was required for a comprehensive development of the entire site for 94 homes.</p>
<h2>Solution</h2>
<ul>
<li>SP Broadway was appointed to fulfil a resident liaison role during the planning process.  Upon submission of the application we sent a briefing letter to over 300 residential and business addresses surrounding the site, providing information about the new scheme alongside our contact details.</li>
</ul>
<ul>
<li>For over four months we handled all resident queries, liaising with the project team to provide residents with answers to technical questions on specific elements of the scheme.</li>
</ul>
<ul>
<li>We liaised extensively with a resident whose home directly adjoined the site, who was concerned about the retention of trees and hedgerows on the site boundary, and also with a representative of the local tennis club regarding a potential contribution towards improvement of their facilities.</li>
</ul>
<ul>
<li>In the run-up to the Planning Committee date, we oversaw the production of a comprehensive briefing letter and brochure explaining the key elements of the proposals, and sent this to all members of Waverley Borough Council&#8217;s Joint Planning Committee.</li>
</ul>
<h2>Result</h2>
<p>Waverley Borough Council Joint Planning Committee members voted to approve our client&#8217;s planning application.</p>
<p>&nbsp;</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/94-new-homes/">94 new homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>518 new homes and 3,150sqm retail</title>
		<link>https://www.spbroadway.com/case_studies/518-new-homes/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 15 Jun 2018 16:35:25 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=2517</guid>

					<description><![CDATA[<p>Background A major housebuilder sought approval for 518 homes alongside 3,150sqm of flexible commercial space on the site of the Former Civic Offices in Bexleyheath town centre. Challenge The site was an urban ‘off town centre’ location which had been derelict since 2012, and previous consented developments had failed to materialise. There were widespread concerns &#8230; <a href="https://www.spbroadway.com/case_studies/518-new-homes/" class="more-link">Continue reading<span class="screen-reader-text"> "518 new homes and 3,150sqm retail"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/518-new-homes/">518 new homes and 3,150sqm retail</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="color: #1f4980;"><strong>Background</strong></span></p>
<p>A major housebuilder sought approval for 518 homes alongside 3,150sqm of flexible commercial space on the site of the Former Civic Offices in Bexleyheath town centre.</p>
<p><span style="color: #1f4980;"><strong>Challenge</strong></span></p>
<ul>
<li>The site was an urban ‘off town centre’ location which had been derelict since 2012, and previous consented developments had failed to materialise.</li>
</ul>
<ul>
<li>There were widespread concerns about density, height and scale of the development, focussed on the inclusion of a 13 storey landmark building in the north western corner of the site.</li>
</ul>
<ul>
<li>The ward councillor and MP had stated their opposition to the scheme.</li>
</ul>
<p><span style="color: #1f4980;"><strong>Solution</strong></span></p>
<ul>
<li>We compiled a comprehensive Political &amp; Community Stakeholder Survey and identifed the elected members and community leaders who could impact the planning application.</li>
</ul>
<ul>
<li>We organised an initial two-day public exhibition, and invited over 1,800 residents, political stakeholders and journalists. Attendees filled in feedback forms, providing useful comments to help our client finalise the detail of the scheme before submission. We then held a second two-day public exhibition 3 weeks later, responding specifically to the points raised at the first exhibition.</li>
</ul>
<ul>
<li>Post-submission we held a further feedback session for residents who continued to be interested in the application, which generated 28 letters of support. We then encouraged these residents to ensure they submitted their letters of support to the Council’s official consultation.</li>
</ul>
<ul>
<li>We held individual meetings with important stakeholders including the MP, the Leader of the Council, the Assembly Member and the NHS Clinical Commissioning Group, and presented to Bexleyheath BID to secure support from local businesses.</li>
</ul>
<p><span style="color: #1f4980;"><strong>Result</strong></span></p>
<p><strong> </strong>After a lengthy debate at Bexley Borough Council Planning Committee, with 4 votes in favour and 4 votes against, the Chair of the Planning Committee used their casting vote to approve the scheme.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/518-new-homes/">518 new homes and 3,150sqm retail</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Post consent amendments and resident liaison</title>
		<link>https://www.spbroadway.com/case_studies/post-consent-amendments-and-resident-liaison/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 12 Jun 2018 15:37:53 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=2506</guid>

					<description><![CDATA[<p>Background Bellway Homes sought to submit Section 73 applications with regard to a mixed-use development in the London Borough of Greenwich. The original consent had been given in 2013 and Bellway had taken over the scheme from another developer in 2016, with the intention of building out the final phase. The Section 73 applications sought &#8230; <a href="https://www.spbroadway.com/case_studies/post-consent-amendments-and-resident-liaison/" class="more-link">Continue reading<span class="screen-reader-text"> "Post consent amendments and resident liaison"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/post-consent-amendments-and-resident-liaison/">Post consent amendments and resident liaison</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="color: #1f4980;"><strong>Background</strong></span></p>
<p>Bellway Homes sought to submit Section 73 applications with regard to a mixed-use development in the London Borough of Greenwich. The original consent had been given in 2013 and Bellway had taken over the scheme from another developer in 2016, with the intention of building out the final phase. The Section 73 applications sought to change the design of the new homes in the final phase, and increase their number.</p>
<p><span style="color: #1f4980;"><strong>Challenge</strong></span></p>
<p>Since the original consent in 2013, the scheme had already increased in size once, stretching the patience of councillors. In addition, access to the scheme ran through residential streets and over recent years residents had been aggrieved by construction traffic in the area during the build out.  There was a real risk that residents opposed to the scheme because of these traffic issues would use the Section 73 applications as an opportunity to voice their opposition to councillors, potentially derailing the progress of the development.</p>
<p><span style="color: #1f4980;"><strong>Solution</strong></span></p>
<ul>
<li>SP Broadway invited residents to attend a Community Liaison Group, where construction, access, and other issues could be raised and resolved. Around 40 residents attended the meeting, chaired by SP Broadway, and a number of issues were addressed, taking the heat out of the situation. It was agreed to hold the meetings quarterly, until the construction of the final phase was completed.</li>
</ul>
<ul>
<li>We created and maintained a project website, containing up-to-date information on the Section 73 applications, to keep residents updated after the meeting.</li>
</ul>
<ul>
<li>We responded to all resident queries in the run-up to determination of the planning applications, ensuring that all issues raised were managed and not directed at councillors.</li>
</ul>
<ul>
<li>We wrote to all Planning Committee members before determination dates, clearly setting out how the Section 73 applications would improve the scheme, and deliver more affordable homes.</li>
</ul>
<p><span style="color: #1f4980;"><strong>Result</strong></span></p>
<p>The first application, an uplift of 16 homes, was unanimously consented. The second application, for a further uplift of 10 homes, was consented by 10 votes to 1.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/post-consent-amendments-and-resident-liaison/">Post consent amendments and resident liaison</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Mineral extraction</title>
		<link>https://www.spbroadway.com/case_studies/mineral-extraction/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 12 Jun 2018 15:32:25 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=2504</guid>

					<description><![CDATA[<p>Background Cemex – a leading global producer of cement, concrete and other building materials – sought consent for the recovery of minerals from a former airfield near Slough. Challenge The land formed a crucial part of the Western Rail Link to Heathrow. It was crucial that consent was awarded quickly, to allow the recovery works &#8230; <a href="https://www.spbroadway.com/case_studies/mineral-extraction/" class="more-link">Continue reading<span class="screen-reader-text"> "Mineral extraction"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/mineral-extraction/">Mineral extraction</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="color: #1f4980;"><strong>Background</strong></span></p>
<p>Cemex – a leading global producer of cement, concrete and other building materials – sought consent for the recovery of minerals from a former airfield near Slough.</p>
<p><span style="color: #1f4980;"><strong>Challenge</strong></span></p>
<ul>
<li>The land formed a crucial part of the Western Rail Link to Heathrow. It was crucial that consent was awarded quickly, to allow the recovery works to synchronise with the railway scheme.</li>
</ul>
<ul>
<li>Mineral extraction requires a significant number of HGV movements, and the site was close to Iver, a town where this was an existing concern. The County Council had expressed the need for a new road to avoid HGVs travelling through Iver.</li>
</ul>
<p><span style="color: #1f4980;"><strong>Solution</strong></span></p>
<ul>
<li>SP Broadway compiled a detailed Political and Community Stakeholder Survey. This identified the key stakeholders on Buckinghamshire County Council – the decision-making authority – but also those on Slough Borough, South Bucks District, and Iver Parish Councils, who could influence local perception of the scheme.</li>
</ul>
<ul>
<li>We arranged and attended several meetings with local ward councillors and Cabinet members, to brief them on the proposals, explain the benefits of the scheme and understand their concerns.</li>
</ul>
<ul>
<li>SP Broadway organised a public exhibition, allowing Cemex to display the plans and discuss them with residents.</li>
</ul>
<ul>
<li>We assisted Cemex in the production of a leaflet, issued to residents and stakeholders upon application submission. This leaflet emphasised the potential for the scheme to work in harmony with the Western Rail Link to Heathrow – providing construction materials for the railway tunnel from the site itself, thus reducing HGV movements in the future.</li>
</ul>
<p><span style="color: #1f4980;"><strong>Result</strong></span></p>
<p>Buckinghamshire County Council Development Control Committee unanimously agreed to delegate the decision to the Head of Planning &amp; Environment, who awarded the scheme planning permission.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/mineral-extraction/">Mineral extraction</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>394 new homes</title>
		<link>https://www.spbroadway.com/case_studies/394-new-homes/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 12 Jun 2018 15:13:37 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=2500</guid>

					<description><![CDATA[<p>Background A national housebuilder sought to gain consent for a 394-home project in Rainham, Havering. Challenge The site had a chequered history, with an application by another housebuilder for more than 700 homes having been rejected years earlier. Our client had seen their application deferred twice within a matter of months due to unresolved concerns &#8230; <a href="https://www.spbroadway.com/case_studies/394-new-homes/" class="more-link">Continue reading<span class="screen-reader-text"> "394 new homes"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/394-new-homes/">394 new homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="color: #1f4980;"><strong>Background</strong></span></p>
<p>A national housebuilder sought to gain consent for a 394-home project in Rainham, Havering.</p>
<p><span style="color: #1f4980;"><strong>Challenge</strong></span></p>
<ul>
<li>The site had a chequered history, with an application by another housebuilder for more than 700 homes having been rejected years earlier.</li>
</ul>
<ul>
<li>Our client had seen their application deferred twice within a matter of months due to unresolved concerns regarding parking – there had been a local campaign by the site and neighbouring ward councillors, and committee members were concerned about a precedent being set for parking provision.</li>
</ul>
<p><span style="color: #1f4980;"><strong>Solution</strong></span></p>
<ul>
<li>Appointed days after the second deferral, our first step was to undertake a detailed Political &amp; Community Stakeholder Survey that would provide our client with a full understanding of the key influencers in Rainham and the Borough.</li>
</ul>
<ul>
<li>Using this research, SP Broadway arranged and attended a briefing meeting with a key Cabinet Member, who reassured our client that there was still a desire to see the scheme come forward.</li>
</ul>
<ul>
<li>We drafted and sent a detailed 5-page briefing letter to all members of the planning committee. This focussed on the changes made to the scheme in direct response to the concerns expressed at committee, highlighting the enhanced design, new access arrangements, financial contributions, and most crucially an increased parking provision.</li>
</ul>
<p><span style="color: #1f4980;"><strong>Result</strong></span></p>
<p>At committee, the ward councillors encouraged the members to defer the application for a third time. After a long debate, the scheme was granted planning permission by 7 votes to 4 along party lines.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/394-new-homes/">394 new homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>90 new homes</title>
		<link>https://www.spbroadway.com/case_studies/90-new-homes/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 01 May 2018 10:26:02 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=2454</guid>

					<description><![CDATA[<p>Background Our client sought consent to build 90 new homes and a railway station car park on fields on the edge of a village. Challenge Concerns had been raised about too much development in the local area in general, in addition to specific concerns about traffic and parking. SP Broadway had to communicate the merits &#8230; <a href="https://www.spbroadway.com/case_studies/90-new-homes/" class="more-link">Continue reading<span class="screen-reader-text"> "90 new homes"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/90-new-homes/">90 new homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="color: #1f4980;"><strong>Background</strong></span></p>
<p>Our client sought consent to build 90 new homes and a railway station car park on fields on the edge of a village.</p>
<p><span style="color: #1f4980;"><strong>Challenge</strong></span></p>
<ul>
<li>Concerns had been raised about too much development in the local area in general, in addition to specific concerns about traffic and parking.</li>
</ul>
<ul>
<li>SP Broadway had to communicate the merits of our scheme while simultaneously demonstrating how it was a more practical and sustainable option compared to a neighbouring site.</li>
</ul>
<p><span style="color: #1f4980;"><strong>Solution</strong></span></p>
<ul>
<li>SP Broadway drafted a research document analysing recent planning committee meetings to best understand potential opportunities and likely concerns.</li>
</ul>
<ul>
<li>We then drafted and sent a briefing letter to planning committee members, ward members and senior councillors. This letter laid out the advantages of the proposed development, emphasising the scheme’s compliance with the Local Plan, the sustainability of the location and emphasising key aspects of interest to councillors.</li>
</ul>
<ul>
<li>We followed the letter with calls to members prior to the committee, to ensure they had received the letter, to establish whether they had any comments and to answer any last-minute questions.</li>
</ul>
<p><span style="color: #1f4980;"><strong>Result</strong></span></p>
<p>Stroud District Council Planning Committee voted to approve the application in April 2018. Three councillors voted to approve, three voted to oppose, four abstained and the Chairman of the Committee gave a casting vote to the proposals.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/90-new-homes/">90 new homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>3,500 new homes</title>
		<link>https://www.spbroadway.com/case_studies/3500-new-homes/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 01 May 2018 10:04:28 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=2451</guid>

					<description><![CDATA[<p>Background A national housebuilder sought an allocation for 3,500 new homes on an underused airfield in Cambridgeshire.  SP Broadway was instructed to provide political, community and media relations support to promote the inclusion of the site in the council’s Local Plan. Challenge  SP Broadway was instructed after initial concern that the airfield would not be &#8230; <a href="https://www.spbroadway.com/case_studies/3500-new-homes/" class="more-link">Continue reading<span class="screen-reader-text"> "3,500 new homes"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/3500-new-homes/">3,500 new homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="color: #1f4980;"><strong>Background</strong></span></p>
<p>A national housebuilder sought an allocation for 3,500 new homes on an underused airfield in Cambridgeshire.  SP Broadway was instructed to provide political, community and media relations support to promote the inclusion of the site in the council’s Local Plan.</p>
<p><span style="color: #1f4980;"><strong>Challenge</strong></span></p>
<p><strong> </strong>SP Broadway was instructed after initial concern that the airfield would not be included in the emerging Local Plan.  Meanwhile a vocal campaign group had formed to fight the potential inclusion of the proposals in the plan, securing support from some ward councillors.</p>
<p><span style="color: #1f4980;"><strong>Solution</strong></span></p>
<ul>
<li>SP Broadway undertook an initial ring-around of key council members to ascertain their views on the potential inclusion of our client’s site in the Local Plan. These calls established the site was in serious contention for inclusion in the draft plan, but ‘not certain’ to be included.</li>
</ul>
<ul>
<li>SP Broadway organised a meeting with key cabinet members including the council leader and the cabinet member for planning to discuss and promote the merits of the site. Shortly after this meeting the draft plan was published, which included an allocation for 3,500 new homes on the airfield.</li>
</ul>
<ul>
<li>As the Local Plan progressed through various council meetings, we held briefings with ward members and the MP to brief them on the proposals, gain an understanding of their views, and prevent/detect wavering of support.</li>
</ul>
<ul>
<li>To tackle misinformation from the opposition group and any potential public misunderstanding, we launched a dedicated consultation website, outlining the key aspects of the proposed development and promoting the benefits.</li>
</ul>
<ul>
<li>In the run up the council vote on the Local Plan a comprehensive briefing letter and leaflet were sent to all council members. Calls where then made to councillors to answer their questions and where necessary answer their concerns.</li>
</ul>
<p><span style="color: #1f4980;"><strong>Result</strong></span></p>
<p><strong> </strong>The Local Plan was ratified (27 in favour, 21 against) with an allocation for 3,500 new homes on our client’s airfield.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/3500-new-homes/">3,500 new homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>325 homes</title>
		<link>https://www.spbroadway.com/case_studies/325-new-homes-2/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 13 Dec 2019 16:14:37 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=3366</guid>

					<description><![CDATA[<p>Background Our client sought approval for 325 new homes on a greenfield site in Royston, North Hertfordshire. Challenge Whilst there was no opposition to the principle of development on the land, local residents were concerned that the development would stretch Royston’s infrastructure further and increase traffic particularly on the A505 which had an existing issue &#8230; <a href="https://www.spbroadway.com/case_studies/325-new-homes-2/" class="more-link">Continue reading<span class="screen-reader-text"> "325 homes"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/325-new-homes-2/">325 homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="color: #1f4980;"><strong>Background</strong></span></p>
<p>Our client sought approval for 325 new homes on a greenfield site in Royston, North Hertfordshire.</p>
<p><span style="color: #1f4980;"><strong>Challenge</strong></span></p>
<p>Whilst there was no opposition to the principle of development on the land, local residents were concerned that the development would stretch Royston’s infrastructure further and increase traffic particularly on the A505 which had an existing issue with traffic.</p>
<p><span style="color: #1f4980;"><strong>Solution</strong></span></p>
<ul>
<li>SP Broadway undertook an initial ring-around of key council members to ascertain their views on the potential inclusion of our client’s site in the Local Plan. These calls established the site was in serious contention for inclusion in the draft plan, but ‘not certain’ to be included.</li>
<li>We then conducted a comprehensive programme of community consultation which began with a meeting with Royston Town Council Planning Committee and local stakeholders to provide information about the development and answer questions. Feedback provided regarding aspects such as design, housing type and community benefits were incorporated into the emerging plans.</li>
<li>We held a community consultation workshop to discuss in more detail aspects of the emerging proposals and to receive feedback. The workshop was attended by representatives from Royston Town Council, Royston BID, Royston Allotment and Gardens Association and Royston Arts Society.</li>
<li>We organised a public exhibition to introduce the proposal, and invited 2,826 local residents and 22 stakeholders. 76 attendees filled in feedback forms, providing useful comments for our client.</li>
</ul>
<p><span style="color: #1f4980;"><strong>Result</strong></span></p>
<p>Royston Town Council Planning Committee voted to approve the application.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/325-new-homes-2/">325 homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>1,800 new homes</title>
		<link>https://www.spbroadway.com/case_studies/1800-new-homes/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 03 Apr 2018 09:29:40 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=2418</guid>

					<description><![CDATA[<p>Background Our client sought consent for a mixed-use development, including 1,800 new homes, on a former airfield in the Surrey Borough of Waverley.  An earlier application to redevelop the site had been turned down for housing by the Council and at Appeal on traffic and access grounds in 2009. Challenge SP Broadway was instructed to &#8230; <a href="https://www.spbroadway.com/case_studies/1800-new-homes/" class="more-link">Continue reading<span class="screen-reader-text"> "1,800 new homes"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/1800-new-homes/">1,800 new homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="color: #1f4980;"><strong>Background</strong></span></p>
<p>Our client sought consent for a mixed-use development, including 1,800 new homes, on a former airfield in the Surrey Borough of Waverley.  An earlier application to redevelop the site had been turned down for housing by the Council and at Appeal on traffic and access grounds in 2009.</p>
<p><span style="color: #1f4980;"><strong>Challenge</strong></span></p>
<p>SP Broadway was instructed to bring new life to communications after the previous scheme had failed at committee and at Appeal, and to consider how to support a second standalone planning application to run alongside discussions on the allocation of the site in the Council’s Local Plan.</p>
<p><span style="color: #1f4980;"><strong>Solution</strong></span></p>
<ul>
<li>We suggested holding off instigating a communications campaign until after the general election, to avoid the scheme becoming a political football in a key battleground.</li>
</ul>
<ul>
<li>We began by raising the profile &amp; availability of the site and outlining traffic &amp; access solutions in a briefing letter sent to all Waverley councillors.  This letter intimated that a planning application may be brought forward <em>‘to help deliver the Government’s and wider communities’ aspirations for new homes in the area’,</em> and focused on explaining the 10 key advantages of new homes on the airfield.</li>
</ul>
<ul>
<li>We organised a public exhibition to introduce the new proposals.  Feedback showed that 69% of attendees were supportive / unopposed to plans for 1,800 new homes on the site.</li>
</ul>
<ul>
<li>Following the public exhibition we sent an update letter to councillors reminding them of the key advantages of consenting new homes on the site, and set up briefings with key Cabinet Members.</li>
</ul>
<ul>
<li>The Council published its Local Plan Draft Spatial Strategy, which suggested that a new settlement on the airfield <em>‘may offer the best opportunity to meet the Council’s housing needs’</em>.  This was a significant U-turn, and resulted from a sustained and carefully targeted communications campaign.</li>
</ul>
<ul>
<li>We kept up communications with councillors, defending the site’s place in the Local Plan, and the Council approved the Plan with an allocation of 2,600 homes on our client’s site.</li>
</ul>
<p><span style="color: #1f4980;"><strong>Result</strong></span></p>
<p>We provided crucial pre-committee communications in the run up to the Planning Committee decision.  After addressing traffic and access issues with Surrey County Council, the development gained an officer recommendation for approval, and despite last-minute lobbying by the anti-group and pressure from an articulate group of councillors on the Planning Committee, the scheme was consented by 10 votes to 8.</p>
<p>The Secretary of State subsequently called the application in, and after a lengthy examination granted consent.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/1800-new-homes/">1,800 new homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>2,204 new homes</title>
		<link>https://www.spbroadway.com/case_studies/2204-new-homes/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 21 Mar 2018 15:50:35 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=2408</guid>

					<description><![CDATA[<p>Background Our client sought planning permission for a large urban extension to the south of Worcester, providing over 2,000 new homes, 14 hectares of employment land, a new local centre and highway improvements. Challenge The site was on a major political fault line, covering three local authority areas, and therefore required consent from three planning &#8230; <a href="https://www.spbroadway.com/case_studies/2204-new-homes/" class="more-link">Continue reading<span class="screen-reader-text"> "2,204 new homes"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/2204-new-homes/">2,204 new homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="color: #1f4980;"><strong>Background</strong></span></p>
<p>Our client sought planning permission for a large urban extension to the south of Worcester, providing over 2,000 new homes, 14 hectares of employment land, a new local centre and highway improvements.</p>
<p><span style="color: #1f4980;"><strong>Challenge</strong></span></p>
<ul>
<li>The site was on a major political fault line, covering three local authority areas, and therefore required consent from three planning committees.</li>
</ul>
<ul>
<li>Our client’s planning application had been submitted in 2013. Four years on, agreement had not yet been reached with officers on the scheme’s affordable housing contribution, discussions had stalled, and potential committee dates were being routinely pushed back.</li>
</ul>
<p><span style="color: #1f4980;"><strong>Solution</strong></span></p>
<ul>
<li>SP Broadway was instructed to help liaise with political stakeholders, in order to build pressure on officers to agree a position on affordable housing and take the application to committee.</li>
</ul>
<ul>
<li>We drafted a hard-hitting, four-page briefing letter, setting out the many economic and social benefits of the urban extension as well as our client’s position on affordable housing, sending this to all members of all three councils and copying in all the relevant planning officers to spur a response.</li>
</ul>
<ul>
<li>The site also covered three parliamentary constituencies, so we arranged meetings with all three Members of Parliament to make them aware of the current delay and urge them to speak to their council leaders themselves about unlocking the affordable housing deadlock and progressing the application towards committee.</li>
</ul>
<p><span style="color: #1f4980;"><strong>Result</strong></span></p>
<p>Directly prompted by our briefing letter, officers made contact with our client and discussions on affordable housing were finally able to reach a resolution.  Armed with a recommendation for approval from officers, the application was approved by all three councils.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/2204-new-homes/">2,204 new homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>65 new homes</title>
		<link>https://www.spbroadway.com/case_studies/65-homes/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 12 Jan 2018 11:51:09 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=2356</guid>

					<description><![CDATA[<p>Background Our client had purchased a brownfield site in Woolwich with planning consent for 52 homes, and sought an uplift in the number of new homes to 65. Challenge The uplift in numbers was made possible through the proposed removal of a ground level car park, and this had attracted objections from local businesses who &#8230; <a href="https://www.spbroadway.com/case_studies/65-homes/" class="more-link">Continue reading<span class="screen-reader-text"> "65 new homes"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/65-homes/">65 new homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="color: #1f4980;"><strong>Background</strong></span></p>
<p>Our client had purchased a brownfield site in Woolwich with planning consent for 52 homes, and sought an uplift in the number of new homes to 65.</p>
<p><span style="color: #1f4980;"><strong>Challenge</strong></span></p>
<ul>
<li>The uplift in numbers was made possible through the proposed removal of a ground level car park, and this had attracted objections from local businesses who were concerned about the impact of reduced parking availability in the area.</li>
</ul>
<ul>
<li>Political and community representatives of the local area claimed more “family-sized homes” were required, and the new proposals reduced the proportion of three-bedroom flats.</li>
</ul>
<ul>
<li>One of the local ward councillors openly opposed the new scheme, and was registered to speak against the planning application at committee.</li>
</ul>
<p><span style="color: #1f4980;"><strong>Solution</strong></span></p>
<ul>
<li>Instructed the week before the planning committee date, our client asked us to draft a briefing letter to committee members setting out the benefits of the new scheme.</li>
</ul>
<ul>
<li>We studied the officer’s report and the planning application documents, and used this information to draft a concise two-page letter. This emphasised the affordable homes provision – policy compliant in terms of number of homes, and above-policy in terms of habitable rooms – and explained the need to remove on-site parking and reduce the proportion of three-bedroom flats.</li>
</ul>
<ul>
<li>Shortly after sending the letter we contacted the ward councillor known to oppose the scheme, in order to fully understand his concerns about the proposals. We then helped our client formulate a written response to the points he had raised.</li>
</ul>
<p><span style="color: #1f4980;"><strong>Result</strong></span></p>
<p>The ward councillor thanked us for the comprehensive response, and agreed to withdraw his objections and not speak at committee. The planning committee awarded the new scheme a unanimous consent.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/65-homes/">65 new homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>35 new homes</title>
		<link>https://www.spbroadway.com/case_studies/35-new-homes/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 10 Jan 2018 09:38:28 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=2351</guid>

					<description><![CDATA[<p>Background Our client sought outline planning permission to build 35 new homes on greenfield land at the edge of Gosfield, near Braintree, having submitted two tandem applications for two different access options. Challenge The site was located on greenfield land at the edge of a small village, which had experienced very little development for decades. &#8230; <a href="https://www.spbroadway.com/case_studies/35-new-homes/" class="more-link">Continue reading<span class="screen-reader-text"> "35 new homes"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/35-new-homes/">35 new homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="color: #1f4980;"><strong>Background</strong></span></p>
<p>Our client sought outline planning permission to build 35 new homes on greenfield land at the edge of Gosfield, near Braintree, having submitted two tandem applications for two different access options.</p>
<p><span style="color: #1f4980;"><strong>Challenge</strong></span></p>
<ul>
<li>The site was located on greenfield land at the edge of a small village, which had experienced very little development for decades.</li>
</ul>
<ul>
<li>Two alternative access routes were proposed. One was objected to by the Highways Authority. The second access option was recommended for approval by District and County planning officers, but faced objections from members of the Parish Council, and was the subject of a petition signed by 125 opposed local residents and the local primary school.</li>
</ul>
<ul>
<li>Local ward councillors and the Cabinet Member for Planning were hesitant about discussing the proposals.</li>
</ul>
<p><span style="color: #1f4980;"><strong>Solution</strong></span></p>
<ul>
<li>Our client instructed SP Broadway to formulate a communications strategy to gain political support for and minimise opposition to the planning application. We prepared a Political and Stakeholder Survey to identify and analyse the political makeup of Gosfield and Braintree, which enabled us to devise an engagement strategy, and understand the level of community support and key issues of concern.</li>
</ul>
<ul>
<li>SP Broadway attended the Parish Council meeting at which the application was to be discussed, in order to gain a better understanding of local community views and the views of the Parish Council.</li>
</ul>
<ul>
<li>We advised our client to compose a briefing letter to members of Braintree District Council Planning Committee. We guided them through the drafting of the letter, advising on content and tone, and reviewing it to ensure it succinctly outlined the political and community benefits of the scheme for councillors.</li>
</ul>
<ul>
<li>We reviewed and advised on our client’s speech to Braintree Planning Committee, tailoring it to highlight the political merits of the scheme.</li>
</ul>
<p><span style="color: #1f4980;"><strong>Result</strong></span></p>
<p>In spite of the local petition and objections from members of the Parish Council, the scheme gained outline consent at Committee.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/35-new-homes/">35 new homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>New Garden Suburb</title>
		<link>https://www.spbroadway.com/case_studies/new-garden-suburb/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 05 Jan 2018 16:08:51 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=2342</guid>

					<description><![CDATA[<p>Background Our client sought support for their application to provide a new neighbourhood of 1,100 homes on the northern fringe of Ipswich, in addition to a new primary school, local centre and 30-hectare country park. Challenge Henley Gate was 1 of 3 neighbourhoods making up ‘Ipswich Garden Suburb’, allocated within Ipswich Borough Council’s emerging Core &#8230; <a href="https://www.spbroadway.com/case_studies/new-garden-suburb/" class="more-link">Continue reading<span class="screen-reader-text"> "New Garden Suburb"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/new-garden-suburb/">New Garden Suburb</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="color: #1f497d;"><strong>Background</strong></span></p>
<p>Our client sought support for their application to provide a new neighbourhood of 1,100 homes on the northern fringe of Ipswich, in addition to a new primary school, local centre and 30-hectare country park.</p>
<p><span style="color: #1f497d;"><strong>Challenge</strong></span></p>
<p>Henley Gate was 1 of 3 neighbourhoods making up ‘Ipswich Garden Suburb’, allocated within Ipswich Borough Council’s emerging Core Strategy. However, there was concern amongst local community groups about the impact of a significant development. Another developer had submitted an application for a neighbourhood of 815 homes in July 2014 but it had not been brought before the Planning and Development Committee.</p>
<p><span style="color: #1f497d;"><strong>Solution</strong></span></p>
<ul>
<li>A Political and Community Stakeholder Survey was drafted to identify and understand the concerns of groups and individuals, elected and non-elected, likely to have an interest in the planning application.</li>
</ul>
<ul>
<li>Based on our understanding from the Survey, we designed and implemented a comprehensive programme of community engagement. This focused on 1) emphasising our coordination with the Council’s Core Strategy and its previous extensive consultation on the Ipswich Garden Suburb, and 2) communicating a vision of a community that Ipswich would be proud of.</li>
</ul>
<ul>
<li>In engaging with the local residents through a public exhibition, a consultation website and a leaflet mass-mail, the strategy of coordinating messages with the Council’s Core Strategy established the application as the essential end-point of the Ipswich Garden Suburb consultation process.</li>
</ul>
<ul>
<li>In engaging with the media through proactive press releases, we focused on the quality-of-life and community aspects of the scheme to support the vision of a community that Ipswich would be proud of.</li>
</ul>
<ul>
<li>In engaging with political stakeholders through face-to-face meetings and political briefing letters, the two elements of the strategy were combined to maintain and enhance the development’s position as a policy priority for key councillors.</li>
</ul>
<p><span style="color: #1f497d;"><strong>Result</strong></span></p>
<p>Ipswich Borough Council Planning and Development Committee approved the application by 9 votes to 2. The Planning and Development Committee decision gained positive coverage in the local press.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/new-garden-suburb/">New Garden Suburb</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>165 new homes</title>
		<link>https://www.spbroadway.com/case_studies/wyre/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 28 Jul 2017 12:35:26 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=2018</guid>

					<description><![CDATA[<p>Background  Our client sought planning permission for 165 new homes on the edge of Hambleton, a village in Wyre Borough in Lancashire.  Challenge The site was located on a green field on the edge of the village. An opposition group quickly formed and campaigned against the proposals on the grounds that new homes would impact &#8230; <a href="https://www.spbroadway.com/case_studies/wyre/" class="more-link">Continue reading<span class="screen-reader-text"> "165 new homes"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/wyre/">165 new homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="color: #1f497d;"><strong>Background</strong></span></p>
<p><strong> </strong>Our client sought planning permission for 165 new homes on the edge of Hambleton, a village in Wyre Borough in Lancashire.</p>
<p><span style="color: #1f497d;"><strong> </strong><strong>Challenge</strong></span></p>
<p>The site was located on a green field on the edge of the village.</p>
<p>An opposition group quickly formed and campaigned against the proposals on the grounds that new homes would impact the character of a small village. The group encouraged over 400 people, including the local MP, to submit letters of objection to the Council.</p>
<p><span style="color: #1f497d;"><strong>Solution</strong></span></p>
<ul>
<li>We undertook detailed political research into the views and allegiances of members of the Committee, identifying positive messages around the scheme that were likely to resonate with key members.</li>
</ul>
<ul>
<li>We produced and distributed a concise three-page briefing letter to all members of the Wyre Borough Council Planning Committee which outlined the key features of the proposal, and the lengthy consultation that shaped the application. The letter highlighted the sustainability of the site, and of the village of Hambleton, and detailed the generous amount of public open space that the development would provide.</li>
</ul>
<ul>
<li>We followed this briefing letter with courtesy calls to members of the Planning Committee to make sure that they had received the letter, and to establish who would be attending the Committee meeting. We produced a detailed analysis of the responses made by members, providing our client with information on the composition of the Committee on the night, this allowed our client’s speech to the Committee to be specially tailored.</li>
</ul>
<p><span style="color: #1f497d;"><strong>Result  </strong></span></p>
<p>The Wyre Borough Council Planning Committee voted to approve the application by 7 votes to 1.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/wyre/">165 new homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>New food store</title>
		<link>https://www.spbroadway.com/case_studies/new-food-store-2/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 23 May 2017 15:02:53 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=1780</guid>

					<description><![CDATA[<p>Background SP Broadway was instructed to assist with the final stage of consultation on a proposal to build a new supermarket and petrol station on the edge of the town of Ludlow, Shropshire. Challenge Though the planning application was recommended for approval by Shropshire Council officers, the proposal was very controversial locally, opposed by the &#8230; <a href="https://www.spbroadway.com/case_studies/new-food-store-2/" class="more-link">Continue reading<span class="screen-reader-text"> "New food store"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/new-food-store-2/">New food store</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>SP Broadway was instructed to assist with the final stage of consultation on a proposal to build a new supermarket and petrol station on the edge of the town of Ludlow, Shropshire.</p>
<h2>Challenge</h2>
<p>Though the planning application was recommended for approval by Shropshire Council officers, the proposal was very controversial locally, opposed by the town council and Chamber of Commerce for its perceived impact on trade in Ludlow town centre and its impact on traffic.</p>
<h2>Solution</h2>
<ul>
<li>Having been informed by the client that the head of the local community centre had been supportive of the proposals at a public exhibition two years previously, we established her identity and telephoned her to understand her views further. The call established that she remained supportive of the supermarket but she had not submitted her views to the council. At our urging she duly wrote a letter expressing her support for the application and submitted it to the council.</li>
</ul>
<ul>
<li>We drafted and sent a briefing letter to all Planning Committee members, stressing how the proposal would create jobs and consumer choice for Ludlow residents, boost the town’s economy by helping to claw-back trade from other towns in the region, and increase business rate revenue for the council.</li>
</ul>
<ul>
<li>At a meeting, the Planning Committee deferred the application, with a view to refusing.</li>
</ul>
<ul>
<li>Following the deferral we created a petition in favour of the proposal, and placed it in the community centre where we knew we had support.</li>
</ul>
<ul>
<li>We drafted and sent a further briefing letter to Planning Committee Members before the second Committee date, highlighting the changes made to the scheme reflecting comments members made at the earlier Committee, and reminding members about the economic benefits and limited impact on the town centre. We also highlighted the petition in support, and how the majority of residents’ expressing a view during the Council’s own consultation supported the revised proposals.</li>
</ul>
<h2>Result</h2>
<p>The Planning Committee voted by 5 votes to 4 to approve the revised application.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/new-food-store-2/">New food store</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Japanese cultural centre</title>
		<link>https://www.spbroadway.com/case_studies/japanese-cultural-centre/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 23 May 2017 14:39:38 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=1772</guid>

					<description><![CDATA[<p>Background The Japanese Government sought planning permission for change-of-use of a landmark retail building on Kensington High Street to create a centre for the promotion of Japanese culture, “Japan House”, retaining ground floor retail but converting the first floor to a restaurant and the basement to events space. Challenge The area was represented by influential &#8230; <a href="https://www.spbroadway.com/case_studies/japanese-cultural-centre/" class="more-link">Continue reading<span class="screen-reader-text"> "Japanese cultural centre"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/japanese-cultural-centre/">Japanese cultural centre</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>The Japanese Government sought planning permission for change-of-use of a landmark retail building on Kensington High Street to create a centre for the promotion of Japanese culture, “Japan House”, retaining ground floor retail but converting the first floor to a restaurant and the basement to events space.</p>
<h2>Challenge</h2>
<p>The area was represented by influential councillors, the Kensington Society and residents’ associations concerned about losing prime retail space on Kensington High Street to other uses with lower footfall. Residents were also concerned about the impact of the restaurant and events space on local amenity, particularly at night.</p>
<h2>Solution</h2>
<ul>
<li>Instructed to establish lines of communication with key stakeholders, we set up a series of meetings with local councillors, residents’ associations, business representatives and the local civic society.</li>
</ul>
<ul>
<li>After initial meetings the Japan House team subsequently revised the proposals and we set up a second series of meetings with stakeholders to guide them through the changes. The team also agreed to draw up a management plan and to meet with residents on a regular basis once the centre was open.</li>
</ul>
<ul>
<li>Though not necessary for a change-of-use application, we compiled a detailed Statement of Community Involvement for submission with the planning application, explaining our consultation with stakeholders and responding to the issues they had raised.</li>
</ul>
<ul>
<li>Once the application was submitted we handled queries from the local residents’ association, clarifying key points contained in the application documents.</li>
</ul>
<ul>
<li>We also provided strategic advice to the Japan House team on their response to queries raised by officers, members, the Kensington Society and residents regarding the detail of the application.</li>
</ul>
<ul>
<li>With the committee date approaching we drafted a short briefing letter setting out the positives of the scheme, which was then sent to planning committee members by the Japanese Ambassador.</li>
</ul>
<h2>Result</h2>
<p>RBKC Planning Applications Committee voted unanimously to approve the proposals.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/japanese-cultural-centre/">Japanese cultural centre</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Elderly accommodation</title>
		<link>https://www.spbroadway.com/case_studies/elderly-accommodation/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Mon, 20 Feb 2017 16:45:16 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=1560</guid>

					<description><![CDATA[<p>Background Our client sought planning permission to build new accommodation for the elderly on the site of a former depot in Cheadle, Greater Manchester. Challenge The site was in a Conservation Area and adjacent to a historic building of local importance.  There was a concern locally that the proposed building was too big for the &#8230; <a href="https://www.spbroadway.com/case_studies/elderly-accommodation/" class="more-link">Continue reading<span class="screen-reader-text"> "Elderly accommodation"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/elderly-accommodation/">Elderly accommodation</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>Our client sought planning permission to build new accommodation for the elderly on the site of a former depot in Cheadle, Greater Manchester.</p>
<h2>Challenge</h2>
<ul>
<li>The site was in a Conservation Area and adjacent to a historic building of local importance.  There was a concern locally that the proposed building was too big for the area.</li>
</ul>
<ul>
<li>There was a perception locally that the proposal would exacerbate traffic problems in Cheadle.</li>
</ul>
<ul>
<li>The local MP had written to the case officer drawing attention to her constituents’ anxieties regarding design and access issues.</li>
</ul>
<h2>Solution</h2>
<ul>
<li>Instructed just days before the planning committee date, our client asked us to draft a short briefing letter to committee members setting out the benefits of providing new homes for the elderly in Stockport borough.</li>
</ul>
<ul>
<li>We studied the officer’s report and our client’s Planning Statement and used this information to draft a concise two-page letter, explaining that the proposal would provide much-needed new elderly accommodation in a highly accessible location, bring family homes back onto the open market, reduce the burden on local Adult Social Care and NHS budgets, help to meet a need for Extra Care units in the borough, contribute to the council’s five-year housing land supply, and provide a sustainable alternative to long-term care in council care homes.</li>
</ul>
<ul>
<li>Once agreed with the client the letter was sent by email to planning committee members.  In the same email we sent members a copy of a letter our client had recently received from a local MP, congratulating them on the completion of a similar elderly accommodation scheme in Leeds.  This letter was invaluable in helping to back up our client’s case that the proposals were of a high quality and would make a positive contribution to Cheadle both visually and culturally.</li>
</ul>
<h2>Result</h2>
<p>The planning application was consented.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/elderly-accommodation/">Elderly accommodation</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Mixed-use redevelopment</title>
		<link>https://www.spbroadway.com/case_studies/mixed-use-redevelopment/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Thu, 05 Jan 2017 14:22:57 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=1485</guid>

					<description><![CDATA[<p>Background Our client was seeking to replace a tired shopping precinct in Botley just outside Oxford, providing new retail space, apartments, student rooms, a hotel, new community centre, church and library. Challenge A previous application for the site attracted more than 1,000 objections and was unanimously refused at planning committee in 2014.  The group that &#8230; <a href="https://www.spbroadway.com/case_studies/mixed-use-redevelopment/" class="more-link">Continue reading<span class="screen-reader-text"> "Mixed-use redevelopment"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/mixed-use-redevelopment/">Mixed-use redevelopment</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="color: #1f4980;"><strong>Background</strong></span></p>
<p>Our client was seeking to replace a tired shopping precinct in Botley just outside Oxford, providing new retail space, apartments, student rooms, a hotel, new community centre, church and library.</p>
<p><span style="color: #1f4980;"><strong>Challenge</strong></span></p>
<p>A previous application for the site attracted more than 1,000 objections and was unanimously refused at planning committee in 2014.  The group that led the opposition remained active in the community and based much of its campaign on opposition to student accommodation in Botley.  All of Botley’s elected representatives opposed the 2014 scheme.</p>
<p><span style="color: #1f4980;"><strong>Solution</strong></span></p>
<ul>
<li>We undertook a comprehensive political and community survey, which concluded that community buy-in was essential to building support for a new application. Our survey showed that political stakeholders would only positively consider the application if a community role in the plan-making process could be demonstrated.</li>
</ul>
<ul>
<li>We designed and implemented a comprehensive programme of community engagement. By emphasising our client’s commitment to meaningful engagement, and showing that the consultation would be transparent, we secured the participation of Botley’s elected representatives and the opposition group.</li>
</ul>
<ul>
<li>Their participation enabled us to deliver a successful consultation programme, which included the setting up of a Community Liaison Group and the holding of series of community workshops. This consultation enabled us to undertake community engagement at each stage of the plan-making process, and to demonstrate how changes to the scheme, including a reduction in student rooms, were the result of consultation feedback.</li>
</ul>
<ul>
<li>The consultation programme concluded with a two-day public exhibition. Feedback from the exhibition showed that a clear majority of respondents welcomed changes to the scheme as a result of the consultation.</li>
</ul>
<ul>
<li>We kept the media updated on the emerging proposals, securing positive coverage of changes to the scheme resulting from the consultation.</li>
</ul>
<ul>
<li>We highlighted the community participation, positive public exhibition feedback and the positive media coverage to the Council leadership.</li>
</ul>
<p><span style="color: #1f4980;"><strong>Result</strong></span></p>
<p>Vale of White Horse District Council approved the application by 8 votes to 3. At the Planning Committee meeting objectors and Committee members commended the quality of the consultation undertaken.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/mixed-use-redevelopment/">Mixed-use redevelopment</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>130 homes</title>
		<link>https://www.spbroadway.com/case_studies/1444/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Thu, 24 Nov 2016 14:11:36 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=1444</guid>

					<description><![CDATA[<p>Background Our client sought to submit a reserved matters application with regard to a 130-home development for land in Chertsey, in the Surrey Borough of Runnymede. The outline application had been consented. Challenge The access for the consented outline scheme ran through a residential street. There was a real risk that residents opposed to the &#8230; <a href="https://www.spbroadway.com/case_studies/1444/" class="more-link">Continue reading<span class="screen-reader-text"> "130 homes"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/1444/">130 homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>Our client sought to submit a reserved matters application with regard to a 130-home development for land in Chertsey, in the Surrey Borough of Runnymede. The outline application had been consented.</p>
<h2>Challenge</h2>
<p>The access for the consented outline scheme ran through a residential street. There was a real risk that residents opposed to the scheme because of this access would use the reserved matters application as an opportunity to voice their opposition to councillors on access grounds, potentially derailing the progress of the development.</p>
<h2>Solution</h2>
<ul>
<li>SP Broadway wrote to residents around the site to notify them of the reserved matters application. This letter stressed that the access had been approved and would not be reconsidered. It also highlighted the high quality design of the new homes, and provided SP Broadway’s contact details in case residents had any questions.</li>
</ul>
<ul>
<li>We created and maintained a project website, containing up-to-date information on the reserved matters application. The website address was highlighted in the notification letter to residents, providing them with a source of extra information if they required it.</li>
</ul>
<ul>
<li>We responded to all resident queries in the run-up to the determination of the planning application, ensuring that all issues raised were managed and not directed at councillors.</li>
</ul>
<ul>
<li>We wrote to all Planning Committee members before the determination date, clearly setting out how the reserved matters application conformed to the outline consent given.</li>
</ul>
<h2>Result</h2>
<p>The reserved matters application was considered by Runnymede Borough Council Planning Committee. With resident opposition addressed through intensive consultation, and the merits of the scheme established in members’ minds, the Committee approved the application.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/1444/">130 homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>6 apartments</title>
		<link>https://www.spbroadway.com/case_studies/6-apartments/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 19 Aug 2016 12:33:34 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=1237</guid>

					<description><![CDATA[<p>Background Our client sought planning permission in a small Buckinghamshire town for the conversion of an out-of-town retail showroom into six apartments. Challenge The showroom was on a busy main road and surrounded by residential properties, with attendant concerns about traffic, parking and overlooking. Solution We organised a meeting for our client with one of &#8230; <a href="https://www.spbroadway.com/case_studies/6-apartments/" class="more-link">Continue reading<span class="screen-reader-text"> "6 apartments"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/6-apartments/">6 apartments</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>Our client sought planning permission in a small Buckinghamshire town for the conversion of an out-of-town retail showroom into six apartments.</p>
<h2>Challenge</h2>
<p>The showroom was on a busy main road and surrounded by residential properties, with attendant concerns about traffic, parking and overlooking.</p>
<h2>Solution</h2>
<ul>
<li>We organised a meeting for our client with one of the local ward members followed by meetings with the occupants or owners of all the properties neighbouring the showroom, to go over the proposals, take note of any concerns raised and make sure the final plans took these concerns into account.</li>
</ul>
<ul>
<li>Once the meetings were completed we prepared a short Statement of Community Involvement for submission with the application, listing the stakeholders we had met and explaining how the designs had changed as a direct result of those meetings.</li>
</ul>
<ul>
<li>On the day the application was submitted to the council we sent copies of the design plans to each of the neighbours, making clear we were happy to meet again to go over any outstanding issues, or discuss over the phone.</li>
</ul>
<ul>
<li>When the council had completed its own consultation on the application and uploaded residents’ comments onto its website, we contacted each of those residents directly to respond to the issues they had raised and ensure they were comfortable with the final plans.</li>
</ul>
<h2>Result</h2>
<p>In a delegated decision, South Bucks District Council officers approved our client’s planning application.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/6-apartments/">6 apartments</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>350 homes</title>
		<link>https://www.spbroadway.com/case_studies/375-homes/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Thu, 05 Jan 2017 16:43:07 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=1489</guid>

					<description><![CDATA[<p>Background Our client sought inclusion in the Tunbridge Wells Local Plan for a greenfield site on the edge of a small town in Kent. Challenge Our client faced competition from two other developers which were promoting alternative greenfield sites in the town for development. Solution We organised meetings for our client with the ward members &#8230; <a href="https://www.spbroadway.com/case_studies/375-homes/" class="more-link">Continue reading<span class="screen-reader-text"> "350 homes"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/375-homes/">350 homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>Our client sought inclusion in the Tunbridge Wells Local Plan for a greenfield site on the edge of a small town in Kent.</p>
<h2>Challenge</h2>
<p>Our client faced competition from two other developers which were promoting alternative greenfield sites in the town for development.</p>
<h2>Solution</h2>
<ul>
<li>We organised meetings for our client with the ward members for the town, the Kent County Council division member and the Headmaster of the local secondary school, and assisted with a presentation to the town council: all designed to understand the views of key local stakeholders.</li>
</ul>
<ul>
<li>We drafted and sent a detailed briefing letter to all members of Tunbridge Wells Borough Council Local Plan Working Party, explaining why our client’s site was the most appropriate location for new housing and how development there could alleviate flooding problems. This was followed by telephone calls to members to gauge views.</li>
</ul>
<ul>
<li>We assisted the client with their participation in a public exhibition organised by the town council, at which the three rival developers presented their proposals to residents. Using a carefully crafted feedback form we gathered opinions from residents on our client’s proposals and compiled these in a feedback report.</li>
</ul>
<ul>
<li>We then drafted and sent a second briefing letter to all members of Tunbridge Wells Borough Council ahead of the Cabinet’s vote on site allocations, urging support for our client’s site. The Cabinet ultimately voted to support allocations on both our client’s site and one of the competing sites.</li>
</ul>
<h2>Result</h2>
<ul>
<li>The Tunbridge Wells Local Plan was approved by a Planning Inspector with an allocation for up to 350 houses on our client’s site.</li>
</ul>
<ul>
<li>An application for 375 houses was unanimously approved by Tunbridge Wells Borough Council Planning Committee.</li>
</ul>
<p>The post <a href="https://www.spbroadway.com/case_studies/375-homes/">350 homes</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>145 houses</title>
		<link>https://www.spbroadway.com/case_studies/145-houses/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 29 Apr 2016 09:31:31 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=1022</guid>

					<description><![CDATA[<p>Background Our client sought planning permission for 145 new homes on the edge of Boroughbridge, a town in Harrogate Borough. Challenge The site is located adjacent to a Registered Battlefield, the site of the medieval Battle of Boroughbridge. The site is located between Boroughbridge and the village of Milby and concerns about settlement coalescence had &#8230; <a href="https://www.spbroadway.com/case_studies/145-houses/" class="more-link">Continue reading<span class="screen-reader-text"> "145 houses"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/145-houses/">145 houses</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<ul>
<li>Our client sought planning permission for 145 new homes on the edge of Boroughbridge, a town in Harrogate Borough.</li>
</ul>
<h2>Challenge</h2>
<ul>
<li>The site is located adjacent to a Registered Battlefield, the site of the medieval Battle of Boroughbridge.</li>
</ul>
<ul>
<li>The site is located between Boroughbridge and the village of Milby and concerns about settlement coalescence had been raised.</li>
</ul>
<h2>Solution</h2>
<ul>
<li>We undertook detailed political research into the views and allegiances of members of the Committee, identifying positive messages around the scheme that were likely to resonate with key members.</li>
</ul>
<ul>
<li>We produced and distributed a five-page briefing letter to all members of Harrogate Borough Council Planning Committee which outlined the key features of the proposal and the community benefits it would deliver, including major footpath enhancements. The letter presented the Registered Battlefield aspect of the application as a positive, describing how the development would protect the northern boundary of the battlefield and fund new visitor facilities. The letter also set out how the green gap between Milby and Boroughbridge would be maintained.</li>
</ul>
<ul>
<li>We followed this briefing letter with courtesy calls to members of the Planning Committee to make sure they had received the letter and to establish whether they had any comments or last-minute questions. We produced a detailed analysis of the responses made by members, providing our client with useful intelligence as they prepared for the Committee.</li>
</ul>
<h2>Result<strong>  </strong><strong> </strong></h2>
<p>Determination was deferred by a month as Planning Committee members requested more information on highways and flooding. The Committee was assured by the extra information provided and the application was approved, with members recognising that the proposals would enhance the Registered Battlefield and preserve the green gap between Boroughbridge and Milby.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/145-houses/">145 houses</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>200 houses</title>
		<link>https://www.spbroadway.com/case_studies/200-houses/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Thu, 21 Apr 2016 14:23:54 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=993</guid>

					<description><![CDATA[<p>Background Our client sought planning permission for up to 200 new homes on the edge of Chard, South Somerset. Challenge Chard Town Council had requested that the development be delayed to align with the emerging Local Plan. Claims about the development’s impact on local roads and schools had been reported by local newspapers. The member &#8230; <a href="https://www.spbroadway.com/case_studies/200-houses/" class="more-link">Continue reading<span class="screen-reader-text"> "200 houses"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/200-houses/">200 houses</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>Our client sought planning permission for up to 200 new homes on the edge of Chard, South Somerset.</p>
<h2>Challenge</h2>
<ul>
<li>Chard Town Council had requested that the development be delayed to align with the emerging Local Plan.</li>
</ul>
<ul>
<li>Claims about the development’s impact on local roads and schools had been reported by local newspapers.</li>
</ul>
<ul>
<li>The member for the site ward, and the members for the two adjacent wards, all sat on the South Somerset District Council Area West Committee which was due to determine the application.</li>
</ul>
<h2>Solution</h2>
<ul>
<li>We produced and distributed a four-page briefing letter to all members of the Area West Committee which outlined the key features of the proposal and its benefits. These benefits included new affordable homes, the creation of new public open space, and contributions to public services. The letter also presented the scheme as an excellent opportunity to provide a new link road – an issue we knew from political research to be critical in convincing Committee members of the development’s value to Chard’s wider growth plan.</li>
</ul>
<ul>
<li>We followed this briefing letter with courtesy calls to members of the Area West Committee to make sure that they had received the letter and to establish whether they had any comments or last-minute questions. We produced a detailed analysis of the responses made by members, providing our client with useful intelligence as they prepared for the Committee.</li>
</ul>
<h2>Result<strong>  </strong><strong> </strong></h2>
<p>Having secured the planning officer’s recommendation for approval, the scheme was approved by South Somerset District Council Area West Committee. Seven councillors voted in favour of the proposals and two abstained.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/200-houses/">200 houses</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>New food store</title>
		<link>https://www.spbroadway.com/case_studies/supermarket-doctors-surgery-3/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 13 Apr 2016 15:41:39 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=977</guid>

					<description><![CDATA[<p>Background SP Broadway was instructed to assist with the final political stage of consultation on an application to redevelop two garden centres on the edge of South Woodham Ferrers, Essex, providing a new Sainsbury’s store and doctor’s surgery. Challenge The site was a long, thin stretch of land outside the Urban Area, extending into open countryside. Parts of the &#8230; <a href="https://www.spbroadway.com/case_studies/supermarket-doctors-surgery-3/" class="more-link">Continue reading<span class="screen-reader-text"> "New food store"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/supermarket-doctors-surgery-3/">New food store</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>Background</strong></p>
<p>SP Broadway was instructed to assist with the final political stage of consultation on an application to redevelop two garden centres on the edge of South Woodham Ferrers, Essex, providing a new Sainsbury’s store and doctor’s surgery.</p>
<p><strong>Challenge</strong></p>
<ul>
<li>The site was a long, thin stretch of land outside the Urban Area, extending into open countryside. Parts of the site were undeveloped, and the site was opposite a Grade II listed cottage.</li>
</ul>
<ul>
<li>Chelmsford City Council had identified a large area of land north of the town for potential residential development in its Local Plan. Our clients’ site formed part of this land, and there was concern the application would be seen as a ‘Trojan Horse’ for further development outside the Urban Area.</li>
</ul>
<p><strong>Solution</strong></p>
<ul>
<li>Our initial research established that South Woodham Ferrers councillors had recently undertaken a survey of residents showing widespread enthusiasm for a new supermarket to rival the existing Asda store, promoting choice and competition.</li>
</ul>
<ul>
<li>We monitored local newspapers and online media to monitor the response to the council’s Local Plan options, and prepared a press release in case the connection was made publicly between our client’s application and the proposed residential development to the north, which could have led to a refusal.</li>
</ul>
<ul>
<li>We drafted and sent a briefing letter to all Planning Committee members, setting out the benefits of the scheme for South Woodham Ferrers residents, followed by calls to members to gauge their attitude to the scheme and answer any questions.</li>
</ul>
<ul>
<li>Planning Committee members chose to defer the application for a month, enabling a site visit to consider the scheme’s impact on 1) landscape 2) highways 3) the listed cottage and 4) the town centre. In the week of the site visit we sent a further briefing letter addressing these four key issues.</li>
</ul>
<p><strong>Result</strong></p>
<p>The application was approved 10 votes to 1 at the second Planning Committee meeting.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/supermarket-doctors-surgery-3/">New food store</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>62 houses</title>
		<link>https://www.spbroadway.com/case_studies/899/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 26 Feb 2016 16:34:54 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=899</guid>

					<description><![CDATA[<p>Background Our client sought planning permission for 62 new homes on the edge of Headcorn, a village in Maidstone Borough. Challenge The site was located in open countryside, within a Special Landscape Area. The Planning Committee included the site ward member, who we understood to be lobbying fellow councillors against the scheme. Solution We undertook &#8230; <a href="https://www.spbroadway.com/case_studies/899/" class="more-link">Continue reading<span class="screen-reader-text"> "62 houses"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/899/">62 houses</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>Our client sought planning permission for 62 new homes on the edge of Headcorn, a village in Maidstone Borough.</p>
<h2>Challenge</h2>
<ul>
<li>The site was located in open countryside, within a Special Landscape Area.</li>
</ul>
<ul>
<li>The Planning Committee included the site ward member, who we understood to be lobbying fellow councillors against the scheme.</li>
</ul>
<h2>Solution</h2>
<ul>
<li>We undertook detailed political research into the views and allegiances of members of the Committee, identifying positive messages around the scheme that were likely to resonate with key members.</li>
</ul>
<ul>
<li>We produced and distributed a five-page briefing letter to all members of Maidstone Borough Council Planning Committee that outlined the key features of the proposal and its benefits. These benefits included improved road safety, the creation of new public open space and also footpath enhancements. The letter also presented the scheme as an excellent opportunity to provide high-quality new wildlife habitats – an issue we knew from our research to be of particular importance to key members of the Committee.</li>
</ul>
<ul>
<li>We followed the briefing letter with courtesy calls to members of the Planning Committee to make sure that they had received the letter and to establish whether they had any comments or last-minute questions. We produced a detailed analysis of the responses made by members, providing our client with useful intelligence as they prepared for the Committee.</li>
</ul>
<h2>Result</h2>
<p>Having secured the planning officer’s recommendation for approval, the scheme was approved by Maidstone Borough Council Planning Committee. Seven councillors voted for the proposal, citing the benefits of the scheme highlighted in the briefing letter, overcoming the votes of the six councillors swayed by the ward member.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/899/">62 houses</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>2 new boarding houses</title>
		<link>https://www.spbroadway.com/case_studies/charterhouse-educational/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 13 Dec 2019 16:28:12 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=3367</guid>

					<description><![CDATA[<p>Background Charterhouse School sought planning permission for two new boarding houses and 77 car parking spaces on Green Belt land within their 250 acre campus to provide 128 extra rooms for the school to meet its ambition to become fully coeducational and take the number of pupils from 800 to 1,088. Challenge The proposed boarding &#8230; <a href="https://www.spbroadway.com/case_studies/charterhouse-educational/" class="more-link">Continue reading<span class="screen-reader-text"> "2 new boarding houses"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/charterhouse-educational/">2 new boarding houses</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>Charterhouse School sought planning permission for two new boarding houses and 77 car parking spaces on Green Belt land within their 250 acre campus to provide 128 extra rooms for the school to meet its ambition to become fully coeducational and take the number of pupils from 800 to 1,088.</p>
<h2>Challenge</h2>
<p>The proposed boarding homes lay in the Green Belt, and local residents and councillors opposed the scheme. The scheme was further complicated by being mistakenly conflated with separate, previous development proposals the school had put forward for new homes on school playing fields.</p>
<h2>Solution</h2>
<ul>
<li>Following Borough elections which resulted in a change from a Conservative majority administration to an Independent/Liberal Democrat partnership (with support from Labour and Greens), we wrote a political survey identifying key political stakeholders in the new administration who could affect the outcome.</li>
</ul>
<ul>
<li>SP Broadway organised and attended meetings with the newly elected ward councillor to brief him on the proposals.</li>
</ul>
<ul>
<li>We assisted the project team in making a presentation explaining the merits of the scheme to Godalming Town Council. We followed up the presentation by sending letters to every Godalming Town Councillor setting out the merits of the scheme and the mitigation measures which had been adopted. We subsequently engaged with every member of the Waverley Joint Planning Committee, sending them a detailed letter to explain the scheme and its merits, as well as the benefits of the school becoming fully co-educational.</li>
</ul>
<h2>Result</h2>
<p>At a meeting of Waverley Borough Council Joint Planning Committee Members, the committee voted to approve the planning application, with 14 voting for, five against and two abstaining.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/charterhouse-educational/">2 new boarding houses</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>New school buildings</title>
		<link>https://www.spbroadway.com/case_studies/new-school-buildings/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 10 Feb 2016 05:32:40 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=751</guid>

					<description><![CDATA[<p>Background A boarding school in Hertfordshire sought planning consent to demolish a postwar building on its campus and replace with two new buildings, providing much-needed accommodation for students and staff. Challenge The application site was adjacent to a number of residential properties. An application had been submitted before but refused at committee because of the &#8230; <a href="https://www.spbroadway.com/case_studies/new-school-buildings/" class="more-link">Continue reading<span class="screen-reader-text"> "New school buildings"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/new-school-buildings/">New school buildings</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2 style="text-align: justify;">Background</h2>
<p style="text-align: left;">A boarding school in Hertfordshire sought planning consent to demolish a postwar building on its campus and replace with two new buildings, providing much-needed accommodation for students and staff.</p>
<h2 style="text-align: justify;">Challenge</h2>
<p style="text-align: left;">The application site was adjacent to a number of residential properties. An application had been submitted before but refused at committee because of the impact of the new buildings on these properties.</p>
<h2 style="text-align: justify;">Solution</h2>
<p style="text-align: left;">Having submitted a revised application that sought to adress the reasons for refusal, SP Broadway was instructed to assist the school with communications to planning committee members in the run-up to the committee date.</p>
<ul style="text-align: justify;">
<li style="list-style-type: none;">
<ul>
<li style="text-align: left;">We advised the school to send an initial letter to members once the revised application was submitted, making clear exactly what was proposed and the changes made to the scheme since the refusal. An initial draft was produced by the planning consultant and we then reviewed the text, suggesting a series of amendments and refinements to ensure clarity of communication and maximum use of standard English.</li>
</ul>
</li>
<li style="text-align: left;">Once the officer&#8217;s report was published in advance of the committee date, we assisted the planning consultant in producing a second letter to planning committee members, specifically addressing issues raised in an objection by one of the neighbouring residents. Again the emphasis was on explaining how the application addressed these issues &#8211; most of the detail of which was technical &#8211; in as clear and easy-to-understand a fashion as possible.</li>
</ul>
<ul style="text-align: justify;">
<li style="text-align: left;">We also reviewed a draft of the planning consultant&#8217;s speech to the planning committee, suggesting specific amendments to the text and providing general advice on delivery.</li>
</ul>
<h2 style="text-align: justify;">Result</h2>
<p style="text-align: left;">The revised application was unanimously approved by East Herts Development Management Committee.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/new-school-buildings/">New school buildings</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>300 houses</title>
		<link>https://www.spbroadway.com/case_studies/300-houses/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 27 Jan 2016 11:50:09 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=525</guid>

					<description><![CDATA[<p>Background Our client sought consent to build 300 new homes on greenfield land on the outskirts of Grantham. Challenge The site was on greenfield land on the urban edge of Grantham, where concerns had been raised locally about the potential noise impact from the nearby A1 and the use of the site as a wildlife &#8230; <a href="https://www.spbroadway.com/case_studies/300-houses/" class="more-link">Continue reading<span class="screen-reader-text"> "300 houses"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/300-houses/">300 houses</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>Our client sought consent to build 300 new homes on greenfield land on the outskirts of Grantham.</p>
<h2>Challenge</h2>
<p>The site was on greenfield land on the urban edge of Grantham, where concerns had been raised locally about the potential noise impact from the nearby A1 and the use of the site as a wildlife habitat.</p>
<h2>Solution</h2>
<ul>
<li>SP Broadway undertook pre-committee lobbying, drafting and sending a five-page briefing letter to planning committee members. This letter laid out the advantages of the proposed development, emphasising the client’s accordance with the Local Plan, the sustainability of the location and the potential economic benefits to the local area.</li>
</ul>
<ul>
<li>The letter also directly addressed the known grounds of local concern and how these had been taken into account by the client, including an overview of the community consultation undertaken and how the feedback received had been used to inform the final plans. The letter also laid out clearly how the proposals would benefit the community through contributions to local services.</li>
</ul>
<ul>
<li>We then followed the letter with calls to planning committee members in the week prior to the committee, to ensure they had received the letter, to establish whether they had any comments and to answer any last-minute questions.</li>
</ul>
<h2>Result</h2>
<p>South Kesteven District Council Planning Committee voted to approve the application.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/300-houses/">300 houses</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Campus refurbishment</title>
		<link>https://www.spbroadway.com/case_studies/campus-refurbishment-2/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 19 Jan 2016 06:02:11 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=341</guid>

					<description><![CDATA[<p>Background A university based in South East London had submitted a planning application to Royal Borough of Greenwich to refurbish the Dreadnought building, a Grade II listed building on its historic Greenwich campus, next to the Old Royal Naval College. Formerly the university library, the building would become the base for some faculty departments, as &#8230; <a href="https://www.spbroadway.com/case_studies/campus-refurbishment-2/" class="more-link">Continue reading<span class="screen-reader-text"> "Campus refurbishment"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/campus-refurbishment-2/">Campus refurbishment</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>A university based in South East London had submitted a planning application to Royal Borough of Greenwich to refurbish the Dreadnought building, a Grade II listed building on its historic Greenwich campus, next to the Old Royal Naval College. Formerly the university library, the building would become the base for some faculty departments, as well as provide new facilities for the Students&#8217; Union.</p>
<h2>Challenge</h2>
<p>Being a prominent listed building within the Maritime Greenwich World Heritage Site, the fate of the building was of interest to an unusually large number of stakeholder bodies and local interest groups.</p>
<h2>Solution</h2>
<ul>
<li>In order to make residents aware of the planning application, SP Broadway organised a one-day public exhibition of the proposals, held in the Dreadnought building. Using specialised mapping software we created a radius of invitees and sent an invitation letter to all residential and business addesses within this radius, totalling some 440 invitations.</li>
</ul>
<ul>
<li>We also organised a short preview of the exhibition display for key stakeholders, held on the same day before it opened to the public. We sent out personal invitations to over 100 stakeholders and arranged for the Vice-Chancellor to address the event. We also liaised with university staff regarding catering and logistics.</li>
</ul>
<h2>Result</h2>
<p>Our client thanked us for &#8220;all the hard work that led to a successful [consultation] event&#8230;the Vice Chancellor and University were very happy&#8221;. The planning application was approved by Royal Borough of Greenwich.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/campus-refurbishment-2/">Campus refurbishment</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>120 houses</title>
		<link>https://www.spbroadway.com/case_studies/120-houses/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 19 Jan 2016 05:37:56 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=333</guid>

					<description><![CDATA[<p>Background Our client sought planning permission to build 120 new homes on the edge of Colchester in Tendring District. Challenge A high level of interest from members of both Tendring District Council and Colchester Borough Council. A greenfield site with sensitive boundaries to ancient woodland and neighbouring residents. Political upheaval during the pre-application process owing &#8230; <a href="https://www.spbroadway.com/case_studies/120-houses/" class="more-link">Continue reading<span class="screen-reader-text"> "120 houses"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/120-houses/">120 houses</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>Our client sought planning permission to build 120 new homes on the edge of Colchester in Tendring District.</p>
<h2>Challenge</h2>
<ul>
<li>A high level of interest from members of both Tendring District Council and Colchester Borough Council.</li>
</ul>
<ul>
<li>A greenfield site with sensitive boundaries to ancient woodland and neighbouring residents.</li>
</ul>
<ul>
<li>Political upheaval during the pre-application process owing to the 2015 general election.</li>
</ul>
<h2>Solution</h2>
<ul>
<li style="list-style-type: none;">
<ul>
<li>Our client instructed SP Broadway to formulate a communications strategy to gain political support and minimise potential opposition for their application. We held meetings with key local members including the chair of planning committee and the leader of the neighbouring local authority, understanding key concerns and areas of agreement.</li>
</ul>
</li>
<li style="list-style-type: none;">
<ul>
<li>We then worked with adjacent residents to the site at a community liaison meeting, and were able to address individual concerns directly. Following this we arranged a public exhibition, inviting key local stakeholders and residents. Engaging closely with the media, we gained positive coverage about the proposals and the exhibition.</li>
</ul>
</li>
<li style="list-style-type: none;">
<ul>
<li>Prior to committee, we drafted a comprehensive political briefing brochure outlining the merits of the scheme, including the positive feedback from the consultation.</li>
</ul>
</li>
</ul>
<h2>Result</h2>
<p>In spite of the sensitive location and some concerns from local residents, this application obtained only four objections from local residents, and gained the support of the parish council. Following officer recommendation for approval, the proposal was unanimously consented by Tendring District Council Planning Committee. Members of both the administration and opposition commended the engagement undertaken for the application.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/120-houses/">120 houses</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>292 houses</title>
		<link>https://www.spbroadway.com/case_studies/292-houses/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 27 Jan 2016 11:46:26 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=523</guid>

					<description><![CDATA[<p>Background Our client was seeking planning permission to build 292 new homes on the edge of a market town in Braintree District. Challenge The site was greenfield and was located outside the development boundary for the town.  An opposition group had secured sustained media coverage of claims that the proposals would strain local services and &#8230; <a href="https://www.spbroadway.com/case_studies/292-houses/" class="more-link">Continue reading<span class="screen-reader-text"> "292 houses"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/292-houses/">292 houses</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>Our client was seeking planning permission to build 292 new homes on the edge of a market town in Braintree District.</p>
<h2>Challenge</h2>
<p>The site was greenfield and was located outside the development boundary for the town.  An opposition group had secured sustained media coverage of claims that the proposals would strain local services and lead to traffic congestion.</p>
<h2>Solution</h2>
<ul>
<li>Asked by our client to assist in the run-up to the planning committee date, SP Broadway drafted and sent a five-page briefing letter to planning committee members. This made clear that the site could deliver new homes in a sustainable location to help meet Braintree’s housing needs, with development also boosting trade for the market town’s high street businesses. The letter also laid out point-by-point how the proposals would benefit existing residents through the provision of highways improvements, new community space and an extension of the GP surgery.</li>
</ul>
<ul>
<li>We then followed the letter up with courtesy calls to planning committee members in the week of the committee, to make sure they had received the letter, to establish whether they had any comments and to answer any last-minute questions.</li>
</ul>
<h2>Result</h2>
<p>Having secured the planning officer’s recommendation for approval, the scheme was approved by 11 votes to 1.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/292-houses/">292 houses</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>210 houses &#038; care home</title>
		<link>https://www.spbroadway.com/case_studies/210-houses-care-home/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 27 Jan 2016 11:39:16 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=521</guid>

					<description><![CDATA[<p>Background A consortium asked SP Broadway to run the community consultation for its plans to build 210 new homes and a care home on the site of a former military hospital in East Dorset. Challenge The access route for the planned development would lead onto the already-congested A31, raising concerns amongst residents about increased traffic &#8230; <a href="https://www.spbroadway.com/case_studies/210-houses-care-home/" class="more-link">Continue reading<span class="screen-reader-text"> "210 houses &#038; care home"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/210-houses-care-home/">210 houses &#038; care home</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>A consortium asked SP Broadway to run the community consultation for its plans to build 210 new homes and a care home on the site of a former military hospital in East Dorset.</p>
<h2>Challenge</h2>
<p>The access route for the planned development would lead onto the already-congested A31, raising concerns amongst residents about increased traffic levels. Additionally, the hospital was located in an environmentally sensitive area with acid grasslands, bats, badgers and reptiles.</p>
<h2>Solution</h2>
<ul>
<li>We first took out a subscription to local newspapers to keep aware of planning and development issues in East Dorset and the views of key stakeholders, circulating relevant articles to the project team in a weekly email.</li>
</ul>
<ul>
<li>We then organised a public exhibition, advertised in local newspapers. The exhibition was attended by 189 residents and stakeholders and 59 filled in a feedback form. Analysis of the forms showed 97% of respondents either supported or did not explicitly oppose the proposals, though there were understandable concerns about traffic and access.</li>
</ul>
<ul>
<li>After the exhibition we set up a consultation website to enable interested residents to access up-to-date and accurate information about the scheme 24 hours a day, 7 days a week.</li>
</ul>
<ul>
<li>Once the proposals had been revised to address concerns we organised a second exhibition, attended by 191 residents and stakeholders. 39 attendees completed feedback forms, with analysis revealing fewer concerns about traffic and access and majority support for proposed ecological protection measures.</li>
</ul>
<ul>
<li>After the second exhibition we drafted a concise three-page briefing letter to send to planning committee members ahead of determination; however this letter was not ultimately sent since feedback from the council was overwhelmingly positive in the run-up to committee.</li>
</ul>
<h2>Result</h2>
<p>The proposals were unanimously approved by East Dorset District Council Planning Committee.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/210-houses-care-home/">210 houses &#038; care home</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>66 houses</title>
		<link>https://www.spbroadway.com/case_studies/66-houses/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 27 Jan 2016 12:05:09 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=531</guid>

					<description><![CDATA[<p>Background A national housebuilder instructed SP Broadway to run the community consultation for the development of 66 new homes in the village of Northiam, East Sussex. The proposals included generous open space provision and would meet the village&#8217;s housing requirements for the next 20 years. Challenge The development would substantially increase the overall size of &#8230; <a href="https://www.spbroadway.com/case_studies/66-houses/" class="more-link">Continue reading<span class="screen-reader-text"> "66 houses"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/66-houses/">66 houses</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>A national housebuilder instructed SP Broadway to run the community consultation for the development of 66 new homes in the village of Northiam, East Sussex. The proposals included generous open space provision and would meet the village&#8217;s housing requirements for the next 20 years.</p>
<h2>Challenge</h2>
<ul>
<li>The development would substantially increase the overall size of the village, where there were already concerns that further housing could not be accommodated and fears the village may become a town.</li>
</ul>
<ul>
<li>Residents immediately adjacent to the site were strongly opposed and concerned about a loss of views and the impact of the new homes on their everyday lives.</li>
</ul>
<h2>Solution</h2>
<ul>
<li>SP Broadway conducted an in-depth survey of key political and community stakeholders to ensure that a comprehensive engagement programme could take place.</li>
</ul>
<ul>
<li>We met with the parish council, ward councillors, the county councillor, the local conservation society and the local bowls club to brief them on the proposals and listen to their concerns.</li>
</ul>
<ul>
<li>Immediate site neighbours were invited to a meeting with members of the project team, allowing them to raise their specific concerns in advance of the public consultation.</li>
</ul>
<ul>
<li>We organised a public exhibition in the village, attended by over 300 residents. 136 attendees filled in feedback forms, providing useful comments to help our client finalise the detail of the scheme before submission.</li>
</ul>
<h2>Result</h2>
<p>A planning application was submitted and approved by Rother District Council Planning Committee.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/66-houses/">66 houses</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>20 houses</title>
		<link>https://www.spbroadway.com/case_studies/20-houses/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 27 Jan 2016 11:09:14 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=519</guid>

					<description><![CDATA[<p>Background Our client sought planning permission to build 20 new homes on the site of a small rural business park in the Cotswolds. Communications Challenge The site was in the Green Belt and the Cotswolds Area of Outstanding Natural Beauty (AONB). The new homes were of a highly contemporary design, unusual for a rural setting. &#8230; <a href="https://www.spbroadway.com/case_studies/20-houses/" class="more-link">Continue reading<span class="screen-reader-text"> "20 houses"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/20-houses/">20 houses</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>Our client sought planning permission to build 20 new homes on the site of a small rural business park in the Cotswolds.</p>
<h2>Communications Challenge</h2>
<ul>
<li>The site was in the Green Belt and the Cotswolds Area of Outstanding Natural Beauty (AONB).</li>
</ul>
<ul>
<li>The new homes were of a highly contemporary design, unusual for a rural setting.</li>
</ul>
<h2>Solution</h2>
<ul>
<li>Asked to assist in the run-up to the committee date, SP drafted and sent a four-page briefing letter to committee members. This made clear that most of the existing buildings were no longer suitable for business use and the new homes, though contemporary, were specifically designed to minimise their impact on the landscape. It was also possible to argue that the replacement of low-quality buildings and significant new tree planting represented an enhancement of the scenic beauty of the AONB, and improved the openness of the Green Belt.</li>
</ul>
<ul>
<li>We then followed the letter up with courtesy calls to planning committee members in the week of the committee, to make sure they had received the letter, to establish whether they had any comments and to answer any last-minute questions.</li>
</ul>
<h2>Result</h2>
<p>Having secured the planning officer&#8217;s recommendation for approval, the scheme was unanimously approved.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/20-houses/">20 houses</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>309 houses &#038; apartments</title>
		<link>https://www.spbroadway.com/case_studies/309-houses-apartments/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 27 Jan 2016 11:55:00 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=527</guid>

					<description><![CDATA[<p>Background A luxury housebuilder sought planning consent to redevelop a former university campus north of Chalfont St Peter &#8211; including a listed 18th century manor house and landscaped grounds &#8211; providing 309 new homes and associated facilities. Challenge Though previously-developed land and allocated in the Chiltern Core Strategy, the site was in the Green Belt &#8230; <a href="https://www.spbroadway.com/case_studies/309-houses-apartments/" class="more-link">Continue reading<span class="screen-reader-text"> "309 houses &#038; apartments"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/309-houses-apartments/">309 houses &#038; apartments</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>A luxury housebuilder sought planning consent to redevelop a former university campus north of Chalfont St Peter &#8211; including a listed 18th century manor house and landscaped grounds &#8211; providing 309 new homes and associated facilities.</p>
<h2>Challenge</h2>
<p>Though previously-developed land and allocated in the Chiltern Core Strategy, the site was in the Green Belt and an AONB, and accessble only via narrow country lanes. We had to make clear the local benefits of the development and re-assure stakeholders that the new homes would not generate unacceptable levels of traffic.</p>
<h2>Solution</h2>
<ul>
<li>SP Broadway organised meetings with the ward member for the site, the county council division member and the parish council, empasising the proposed use of a courtesy minibus system to mitigate traffic impact as well as new facilities for the Chiltern Open Air Museum and Amersham &amp; Chalfont Hockey Club, both located on-site.</li>
</ul>
<ul>
<li>Given the site&#8217;s location close to parish, ward and division boundaries we expanded our briefing programme to include the neighbouring parish council and division member. We also met with Cheryl Gillan MP and a local community group.</li>
</ul>
<ul>
<li>Having worked on another project in Chiltern District we knew it was essential to meet with the Chairman of the Planning Committee to explain the proposals and answer his questions before the committee met.</li>
</ul>
<ul>
<li>In the week before determination we sent a crisp, concise briefing letter to every member of the planning committee, outlining the key features of the proposals and explaining the community benefits. We followed this up with calls to committee members to answer any last-minute questions.</li>
</ul>
<h2>Result</h2>
<p>At the committee meeting, members raised concerns about a number of issues, including traffic, sewage and affordable housing. However, the Chairman reassured members on these issues and stressed the point that the site was already allocated for development in the Chiltern Core Strategy. After a lengthy debate, the application was approved by 6 votes to 4.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/309-houses-apartments/">309 houses &#038; apartments</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>550 houses</title>
		<link>https://www.spbroadway.com/case_studies/550-houses-2/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 27 Jan 2016 12:24:22 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=541</guid>

					<description><![CDATA[<p>Background Newcastle City Council proposed an allocation for new homes on Green Belt land in the village of Throckley as part of the NewcastleGateshead One Core Strategy. The land has been owned by our client since 1735, and all development in Throckley has been the result of gifts of land by our client over the &#8230; <a href="https://www.spbroadway.com/case_studies/550-houses-2/" class="more-link">Continue reading<span class="screen-reader-text"> "550 houses"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/550-houses-2/">550 houses</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>Newcastle City Council proposed an allocation for new homes on Green Belt land in the village of Throckley as part of the NewcastleGateshead One Core Strategy. The land has been owned by our client since 1735, and all development in Throckley has been the result of gifts of land by our client over the last three centuries.</p>
<h2>Challenge</h2>
<p>The allocation was opposed by residents whose homes backed onto the land, who had formed a campaign group to fight the inclusion of the site in the Core Strategy. SP Broadway was appointed to help our client keep the site allocated in the Core Strategy.</p>
<h2>Solution</h2>
<ul>
<li>SP Broadway organised a meeting with the Newcastle City Council members for Throckley to understand their views on our client&#8217;s site. While they could see the merit of new housing in the area, they were troubled by the amount proposed and felt there were better sites elsewhere.</li>
</ul>
<ul>
<li>We organised a meeting with leading representatives of the campaign group to understand their views on the site. This established that the group was opposed to any sort of housing on our client&#8217;s site as it was Green Belt land.</li>
</ul>
<ul>
<li>Given that local council members and residents were less than enthusiastic, we decided to focus on winning over other Newcastle City Council members to the idea of development on our client&#8217;s site. Ahead of key cabinet and council votes on the Core Strategy we sent a detailed briefing letter setting out the merits of development on the site and urging its retention in the Core Strategy. Both the cabinet and the full council subsequently voted to submit the Core Strategy to the Planning Inspector with an allocation on our client&#8217;s site.</li>
</ul>
<ul>
<li>During the Planning Inspector&#8217;s examination of the Core Strategy it became clear that a resource was needed to provide a source of information for residents about our client&#8217;s site. We therefore helped to create a new section of our client&#8217;s website dedicated to Throckley, setting out clearly the key aspects of the proposed development and promoting the benefits. We also monitored local newspapers and online media to keep our client aware of any public discussion of the site.</li>
</ul>
<h2>Result</h2>
<p>The NewcastleGateshead One Core Strategy was adopted by Newcastle City Council and Gateshead Council with an allocation for 550 homes on our client&#8217;s site.</p>
<p>SP Broadway continued to provide political advice to our client as they submitted an outline planning application for 580 homes on the site. The application was approved by Newcastle City Council Planning Committee by ten votes to one.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/550-houses-2/">550 houses</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>150 houses</title>
		<link>https://www.spbroadway.com/case_studies/150-houses/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 19 Jan 2016 05:41:59 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=335</guid>

					<description><![CDATA[<p>Background Our client sought to build 150 homes on a brownfield site on the outskirts of Farnborough, Hampshire. Challenge The site crossed the boundary of two planning authorities, Hart District Council and Rushmoor Borough Council. While most of the site and therefore most of the proposed homes were in Hart District, the most sustainable access &#8230; <a href="https://www.spbroadway.com/case_studies/150-houses/" class="more-link">Continue reading<span class="screen-reader-text"> "150 houses"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/150-houses/">150 houses</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>Our client sought to build 150 homes on a brownfield site on the outskirts of Farnborough, Hampshire.</p>
<h2>Challenge</h2>
<p>The site crossed the boundary of two planning authorities, Hart District Council and Rushmoor Borough Council. While most of the site and therefore most of the proposed homes were in Hart District, the most sustainable access closest to local facilities was in Rushmoor borough. Most of the &#8216;gain&#8217; (new homes, council tax receipts) would therefore go to Hart, while most of the &#8216;pain&#8217; (traffic, pressure on local services) would go to Rushmoor.</p>
<h2>Solution</h2>
<ul>
<li>SP Broadway organised an extensive series of meetings with the relevant ward members on Hart District Council and Rushmoor Borough Council, the relevant division members on Hampshire County Council, and the local town council. None of these stakeholders represented the site as a whole therefore offered hugely differing views on its future.</li>
</ul>
<ul>
<li>Realising that our client had to offer a real benefit to the existing community in Rushmoor borough to unlock support, we organised a series of meetings with the Headmaster and Chair of Governors of the neighbouring primary school. These meetings established that there was a problem with traffic outside the school at drop-off and pick-up times.</li>
</ul>
<ul>
<li>We organised a public exhibition, held at the primary school. A week before this we organised a preview for key stakeholders, inviting all the political stakeholders and headteachers of local schools to see an advance copy of the exhibition boards and ask questions of the project team in a controlled environment.</li>
</ul>
<ul>
<li>Once the application was submitted, we held a series of meetings with the Headteacher of the primary school, to agree the creation of a small car park on our client&#8217;s site for school drop-off and pick-up. The Headteacher then wrote to the council to express his view that the application would help with the existing traffic problem. We also met with the Leader of Rushmoor Borough Council and the Rushmoor ward members to update them on these changes.</li>
</ul>
<h2>Result</h2>
<p>Hart District Council approved our client&#8217;s application. Though recommended for approval by officers, Rushmoor Borough Council refused the application on highways grounds. Our client went to appeal and the refusal was overturned.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/150-houses/">150 houses</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>170 apartments</title>
		<link>https://www.spbroadway.com/case_studies/170-apartments-3/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 19 Jan 2016 06:09:51 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=345</guid>

					<description><![CDATA[<p>Background Our client sought to build 170 apartments on a one-hectare brownfield site in the London suburb of Kew. Challenge Two applications by a previous developer to redevelop the site for residential use had failed at planning committee, attracting considerable opposition from ward councillors, surrounding residents’ associations, the local civic society and the Member of &#8230; <a href="https://www.spbroadway.com/case_studies/170-apartments-3/" class="more-link">Continue reading<span class="screen-reader-text"> "170 apartments"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/170-apartments-3/">170 apartments</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>Our client sought to build 170 apartments on a one-hectare brownfield site in the London suburb of Kew.</p>
<h2>Challenge</h2>
<p>Two applications by a previous developer to redevelop the site for residential use had failed at planning committee, attracting considerable opposition from ward councillors, surrounding residents’ associations, the local civic society and the Member of Parliament. Our client assumed the application would be rejected at committee but could be consented at appeal.</p>
<h2>Solution</h2>
<ul>
<li>SP Broadway organised a series of meetings with residents’ associations, encouraging them to ‘invest’ in the scheme through regular input into the design process and incorporating some of their suggestions into the plans, including provision of space on-site for a doctor’s surgery.</li>
</ul>
<ul>
<li>We organised meetings with ward members and the MP, after which one ward member spoke in favour of the site in an open public meeting to the Leader of the Council.</li>
</ul>
<ul>
<li>We held two 2-day public exhibitions. This first exhibition outlined the constraints and opportunities of the site and sought residents’ views on a range of design options and potential community uses. The second exhibition outlined our client’s final proposal having taken into consideration feedback received at the first exhibition. Approximately 50% of respondents provided positive comments.</li>
</ul>
<ul>
<li>We used constructive engagement with high level political decision makers to swiftly end the deadlock when major delays in the planning department of London Borough of Richmond upon Thames and TFL threatened a timely planning committee date.</li>
</ul>
<ul>
<li>We drafted a hard hitting pre-committee briefing letter and designed an A4 colour briefing leaflet for key councillors and stakeholders outlining positives of the scheme and detailing the widespread community support; following this we undertook final pre-committee briefings by phone.</li>
</ul>
<h2>Result</h2>
<p>London Borough of Richmond upon Thames Planning Committee voted unanimously to consent the development. Three of the community groups which had previously opposed development of the site spoke at Planning Committee in support of the application.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/170-apartments-3/">170 apartments</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>70 houses</title>
		<link>https://www.spbroadway.com/case_studies/70-houses/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 27 Jan 2016 12:09:10 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=533</guid>

					<description><![CDATA[<p>Background Our client, a housing association, sought planning consent to develop 70 new homes on a mixed brown field and green field site. Challenge The proposed development was highly controversial amongst local residents, with a large number of neighbours objecting to development of the site. Residents were largely opposed to the layout, density and tenure &#8230; <a href="https://www.spbroadway.com/case_studies/70-houses/" class="more-link">Continue reading<span class="screen-reader-text"> "70 houses"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/70-houses/">70 houses</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>Our client, a housing association, sought planning consent to develop 70 new homes on a mixed brown field and green field site.</p>
<h2>Challenge</h2>
<p>The proposed development was highly controversial amongst local residents, with a large number of neighbours objecting to development of the site. Residents were largely opposed to the layout, density and tenure of homes, in addition to transport concerns. Our challenge was ameliorate the concerns of neighbouring residents while building political support for the proposals amongst senior councillors and ward members.</p>
<h2>Solution</h2>
<p>Appointed post submission, SP Broadway devised a comprehensive communications strategy designed to secure planning consent. This included:</p>
<ul>
<li>A meeting with representative residents and ward members to understand community concerns.</li>
</ul>
<ul>
<li>A follow up meeting with representative residents and ward members briefing them on subsequent amendments made to the scheme to address their concerns.</li>
</ul>
<ul>
<li>A briefing meeting with Labour Cabinet Member for Housing to build high level support for new homes, especially affordable homes.</li>
</ul>
<ul>
<li>After gaining Cabinet level support, a briefing meeting with Planning Committee Chair to outline the proposals.</li>
</ul>
<ul>
<li>A detailed briefing letter to Planning Committee members, explaining the scheme, listing the benefits and detailing how specific areas of concern had been addressed, including transport issues.</li>
</ul>
<h2>Result</h2>
<p>Plymouth City Council Planning Committee voted 7-6 along party political lines to consent the development. One Labour councillor called the plans <em>“brilliant”</em> while another said <em>“we need to accelerate the development on sites like this.”</em></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/70-houses/">70 houses</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Mixed-use city centre scheme</title>
		<link>https://www.spbroadway.com/case_studies/mixed-use-city-centre-scheme-2/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 27 Jan 2016 12:20:51 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=539</guid>

					<description><![CDATA[<p>Background Our client sought planning consent to demolish &#38; replace two retail buildings in Oxford city centre and renovate a third, creating new prime retail space on the ground and basement floors and 133 student rooms above. Challenge The development was in a highly-sensitive location within the Central Conservation Area, in the heart of the &#8230; <a href="https://www.spbroadway.com/case_studies/mixed-use-city-centre-scheme-2/" class="more-link">Continue reading<span class="screen-reader-text"> "Mixed-use city centre scheme"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/mixed-use-city-centre-scheme-2/">Mixed-use city centre scheme</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>Our client sought planning consent to demolish &amp; replace two retail buildings in Oxford city centre and renovate a third, creating new prime retail space on the ground and basement floors and 133 student rooms above.</p>
<h2>Challenge</h2>
<p>The development was in a highly-sensitive location within the Central Conservation Area, in the heart of the historic city and opposite the medieval Carfax Tower. As a consequence the scheme was under intense scrutiny for its impact on the urban fabric, on the medieval street pattern and on city views, particularly from the top of Carfax Tower.</p>
<h2>Solution</h2>
<p>Appointed in the run-up to the Planning Committee date, SP Broadway devised a comprehensive communications strategy designed to communite the benefits of the development. This included:</p>
<ul>
<li>A briefing meeting with the Leader of the Council.</li>
</ul>
<ul>
<li>A presentation to Planning Committee members by the project team.</li>
</ul>
<ul>
<li>A detailed briefing letter to Planning Committee members, explaining the scheme, listing the benefits and addressing specific areas of concern, such as the impact on city views.</li>
</ul>
<ul>
<li>Telephone calls to Planning Committee members in the days before the committee date, to answer any last minute concerns, understand views and gauge the level of likely support.</li>
</ul>
<h2>Result</h2>
<p>Oxford City Council West Area Planning Committee voted unanimously to approve the development in principle.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/mixed-use-city-centre-scheme-2/">Mixed-use city centre scheme</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>New food store</title>
		<link>https://www.spbroadway.com/case_studies/new-food-store-3/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 27 Jan 2016 12:38:28 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=547</guid>

					<description><![CDATA[<p>Background SP Broadway was instructed to undertake a concise programme of political and community consultation to support the redevelopment of an industrial site in Leominster to house a 45,000 sq ft supermarket. Challenge There was a competing application to build a food store on another site in Leominster. Both schemes were vehemently opposed by the &#8230; <a href="https://www.spbroadway.com/case_studies/new-food-store-3/" class="more-link">Continue reading<span class="screen-reader-text"> "New food store"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/new-food-store-3/">New food store</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>SP Broadway was instructed to undertake a concise programme of political and community consultation to support the redevelopment of an industrial site in Leominster to house a 45,000 sq ft supermarket.</p>
<h2>Challenge</h2>
<p>There was a competing application to build a food store on another site in Leominster. Both schemes were vehemently opposed by the local Green Party, and both schemes had been refused once before. We had to do two things: demonstrate that there was real local support for a new supermarket in Leominster, and demonstrate that our client&#8217;s proposal was preferable to the competing site.</p>
<h2>Solution</h2>
<ul>
<li>As soon as the revised application was submitted we wrote to Herefordshire Council Planning Committee members to let them know the changes made and extol the virtues of our client&#8217;s scheme.</li>
</ul>
<ul>
<li>Media monitoring of the local newspaper clearly showed there were Leominster residents who supported a new supermarket. We therefore took out a full-page advertisement in the paper and wrote an open letter to residents, setting out the key benefits of our client&#8217;s proposal and urging supporters to contact the council and make their voices heard.</li>
</ul>
<ul>
<li>We also made a presentation to Leominster Town Council on behalf of our client. Though it had recommended refusal of the initial application and had a substantial Green Party contingent, the town council voted to support our client&#8217;s revised proposal. It also voted to refuse the competing proposal, having supported it the first time around.</li>
</ul>
<ul>
<li>In the week before the committee met we drafted and sent a hard-hitting briefing letter to all Herefordshire Council Planning Committee members, demonstrating the advantages of our client&#8217;s site over the competing proposal and highlighting the support of Leominster Town Council and residents.</li>
</ul>
<h2>Result</h2>
<p>Both schemes were decided at the same meeting of Herefordshire Council Planning Committee. The competing proposal was refused unanimously, while our client&#8217;s proposal was refused by the narrow margin of 10 votes to 7. We succeeded in helping to knock the competing proposal out of contention and demonstrate real support for the benefit of our client, which was encouraged enough to consider an appeal.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/new-food-store-3/">New food store</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Campus refurbishment</title>
		<link>https://www.spbroadway.com/case_studies/campus-refurbishment/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 19 Jan 2016 05:58:46 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=339</guid>

					<description><![CDATA[<p>Background A well-established university in London sought to gain planning consent for a comprehensive regeneration of its campus. SP Broadway was instructed to provide political, community and media communications to secure this planning consent. Challenge As an established institution in the area, it was important our client gained consent in a way that maintained and &#8230; <a href="https://www.spbroadway.com/case_studies/campus-refurbishment/" class="more-link">Continue reading<span class="screen-reader-text"> "Campus refurbishment"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/campus-refurbishment/">Campus refurbishment</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>A well-established university in London sought to gain planning consent for a comprehensive regeneration of its campus. SP Broadway was instructed to provide political, community and media communications to secure this planning consent.</p>
<h2>Challenge</h2>
<p>As an established institution in the area, it was important our client gained consent in a way that maintained and enhanced its standing within the local community. The site, in an area with a number of strong residents’ associations, was controversial with residents concerned the development would further increase the already substantial queues into the university’s car park and further concerns over the design of the regenerated buildings.</p>
<h2>Solution</h2>
<ul>
<li>A series of Community Liaison Groups were organised, enabling key members of the community and local politicians to discuss the proposals in an open and honest environment, encouraging support from within the local community.</li>
</ul>
<ul>
<li>A public exhibition was held over two days to introduce the proposals to residents first hand. A feedback questionnaire was also prepared for the exhibition which allowed valuable information about residents’ views to be gathered, identified areas of concern and provided valuable statistics: with 59% of respondents commenting positively on the proposals.</li>
</ul>
<ul>
<li>In the run-up to the planning committee&#8217;s decision, we sent a letter to each member of the committee highlighting the benefits of the development for the university and for Ealing, and listing the changes made to the scheme following consultation with the community.</li>
</ul>
<h2>Result</h2>
<p>Ealing Council Planning Committee unanimously voted to approve the application.</p>
<p>After further consultation, including another meeting of the Community Liaison Group and a second public exhibition, an application for an additional new university building was submitted to Ealing Council and consented.</p>
<p>SP Broadway was retained as communications adviser during the construction process.  The refurbishment is now complete.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/campus-refurbishment/">Campus refurbishment</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>59 apartments</title>
		<link>https://www.spbroadway.com/case_studies/59-apartments/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 27 Jan 2016 10:30:36 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=507</guid>

					<description><![CDATA[<p>Background Our client sought to redevelop an existing run-down 1970s residential building in the London Borough of Wandsworth and replace it with new high-quality flats. The scheme sought to enhance the street by reflecting the character of the surrounding houses in the new design. Challenge The redevelopment proposed to increase both the height and size &#8230; <a href="https://www.spbroadway.com/case_studies/59-apartments/" class="more-link">Continue reading<span class="screen-reader-text"> "59 apartments"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/59-apartments/">59 apartments</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>Our client sought to redevelop an existing run-down 1970s residential building in the London Borough of Wandsworth and replace it with new high-quality flats. The scheme sought to enhance the street by reflecting the character of the surrounding houses in the new design.</p>
<h2>Challenge</h2>
<ul>
<li>The redevelopment proposed to increase both the height and size of the building; in an area currently receiving its fair share of applications for new, taller buildings.</li>
</ul>
<ul>
<li>Residents and councillors needed to be reassured that the new building would be an improvement and would not overshadow neighbouring houses.</li>
</ul>
<h2>Solution</h2>
<ul>
<li>SP Broadway sent a comprehensive briefing to councillors and planning officers outlining the plans and the benefits for the area.</li>
</ul>
<ul>
<li>SP Broadway liaised with key members of the local community and concerned residents to inform them of the proposals and allay fears over the impact of the redevelopment.</li>
</ul>
<ul>
<li>An invitation letter to the public exhibition was sent to nearby residents and councillors, briefing them on the proposals and inviting further discussion.</li>
</ul>
<ul>
<li>A public exhibition was held and feedback forms were provided, allowing attendees to comment on the proposals. Feedback from the exhibition was largely positive; however several residents expressed concern over the height of the buildings. SP Broadway provided a detailed analysis of the feedback to the project team, allowing the team to better understand how the plans needed to evolve to gain <em>community</em> support.</li>
</ul>
<ul>
<li>SP Broadway worked closely with stakeholders, using this close liaison and the feedback gained from the public exhibition to help steer changes to the proposals to better reflect political and community opinion.</li>
</ul>
<ul>
<li>As a result of consultation with stakeholders and the public exhibition a number of changes to the plans were made, including reduction in the height of the building, additional affordable housing provision, increased parking, greater consideration for right to light, agreed transport initiatives, and substantial CIL payments: all of which reflected concerns raised by stakeholders and residents.</li>
</ul>
<ul>
<li>SP Broadway sent briefing letters to stakeholders, detailing the changes and highlighting why they should support the scheme. This included a final briefing letter in the week of the committee’s decision.</li>
</ul>
<h2>Result</h2>
<ul>
<li>Having gained the planning officers’ recommendation for approval, the scheme was granted planning permission by 6 votes to 2.</li>
</ul>
<ul>
<li>Following a second round of consultation organised by SP Broadway – including additional meetings with residents and a second public exhibition – an application for a rear extension to the new building was submitted to Wandsworth Council and approved.</li>
</ul>
<p>The post <a href="https://www.spbroadway.com/case_studies/59-apartments/">59 apartments</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Historic market regeneration</title>
		<link>https://www.spbroadway.com/case_studies/historic-market-regeneration/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 19 Jan 2016 06:27:18 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=352</guid>

					<description><![CDATA[<p>Background Our client sought to enhance the historic Greenwich Market &#8211; within the Greenwich Town Centre Conservation Area and the Greenwich World Heritage Site &#8211; by bringing forward plans for a new market roof, refurbishing existing buildings and creating a new food court and area of public open space. Challenge A previous application for a &#8230; <a href="https://www.spbroadway.com/case_studies/historic-market-regeneration/" class="more-link">Continue reading<span class="screen-reader-text"> "Historic market regeneration"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/historic-market-regeneration/">Historic market regeneration</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>Our client sought to enhance the historic Greenwich Market &#8211; within the Greenwich Town Centre Conservation Area and the Greenwich World Heritage Site &#8211; by bringing forward plans for a new market roof, refurbishing existing buildings and creating a new food court and area of public open space.</p>
<h2>Challenge</h2>
<p>A previous application for a comprehensive regeneration of the market had proved very unpopular. It was therefore important to distance the new plans for market enhancements from the previous scheme, and to better understand community views.</p>
<h2>Solution</h2>
<ul>
<li>SP Broadway set up meetings with the local London Assembly Member and Member of Parliament.</li>
</ul>
<ul>
<li>We organised a public exhibition over two days.</li>
</ul>
<ul>
<li>Exhibition feedback established that 89% of respondents supported the market enhancements, a statistic we included in a Statement of Community Involvement submitted with the planning application.</li>
</ul>
<ul>
<li>Once the application was submitted we organised a second exhibition over three days, aimed specifically at market traders &amp; retailers. During the exhibition a petition in favour of the market enhancements was signed by 185 people.</li>
</ul>
<ul>
<li>Prior to planning committee we met the two principal local newspapers, to explain that the petition demonstrated widespread support among traders &amp; retailers. Articles subsequently appeared in both papers in the week before the planning committee, highlighting the support in the petition.</li>
</ul>
<h2>Result</h2>
<p>The market enhancements were unanimously approved by Royal Borough of Greenwich Planning Board.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/historic-market-regeneration/">Historic market regeneration</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>47 houses &#038; apartments</title>
		<link>https://www.spbroadway.com/case_studies/47-houses-apartments/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 27 Jan 2016 12:00:20 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=529</guid>

					<description><![CDATA[<p>Background A national housebuilder was seeking to build 47 homes on a 2-acre site in a leafy Buckinghamshire village in the London commuter belt. Challenge The scheme proposed 23.5 houses per hectare in an area where average housing density is 11 houses per hectare, with a mixture of houses and apartment buildings. Both of the &#8230; <a href="https://www.spbroadway.com/case_studies/47-houses-apartments/" class="more-link">Continue reading<span class="screen-reader-text"> "47 houses &#038; apartments"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/47-houses-apartments/">47 houses &#038; apartments</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>A national housebuilder was seeking to build 47 homes on a 2-acre site in a leafy Buckinghamshire village in the London commuter belt.</p>
<h2>Challenge</h2>
<p>The scheme proposed 23.5 houses per hectare in an area where average housing density is 11 houses per hectare, with a mixture of houses and apartment buildings. Both of the ward members were members of the planning committee, and one of them was chairman.</p>
<h2>Solution</h2>
<ul>
<li>We worked with the village community association to organise a drop-in exhibition where residents could view the proposals, speak to the project team and have their say via a feedback form.</li>
</ul>
<ul>
<li>We then organised meetings with the appropriate ward members on the district council, to discuss the exhibition results. The members accepted that 47 homes was a reasonable number, and a win for the community given that the site had previously been earmarked for 100 homes.</li>
</ul>
<ul>
<li>Using this feedback, our client decided to revise its design, reducing the height of one of the apartment buildings and hence the number of dwellings from 47 to 45. In the run-up to the planning committee&#8217;s decision, we sent members a detailed briefing letter outlining the changes made to the scheme and the reasons why it deserved their support.</li>
</ul>
<h2>Result</h2>
<p>Having secured the planning officer&#8217;s recommendation for approval, the scheme was consented by 10 votes to 1.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/47-houses-apartments/">47 houses &#038; apartments</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Regional distribution centre</title>
		<link>https://www.spbroadway.com/case_studies/regional-distribution-centre/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 27 Jan 2016 12:40:41 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=549</guid>

					<description><![CDATA[<p>Background SP Broadway was instructed to undertake a community and political consultation programme for the redevelopment and extension of a regional distribution centre in Warwickshire. The 40 acre site would encompass approximately 62,500sqm of employment space with a mixture of start-up and larger units, creating between 500 and 1,000 jobs. Challenge The communications challenge was &#8230; <a href="https://www.spbroadway.com/case_studies/regional-distribution-centre/" class="more-link">Continue reading<span class="screen-reader-text"> "Regional distribution centre"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/regional-distribution-centre/">Regional distribution centre</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>SP Broadway was instructed to undertake a community and political consultation programme for the redevelopment and extension of a regional distribution centre in Warwickshire. The 40 acre site would encompass approximately 62,500sqm of employment space with a mixture of start-up and larger units, creating between 500 and 1,000 jobs.</p>
<h2>Challenge</h2>
<p>The communications challenge was twofold: careful consultation was needed with the owner of a Grade II listed house immediately adjacent to the site, along with existing tenants and nearby residents. Additionally, a neighbouring distribution centre had already sought and gained planning permission for much of our client’s land.</p>
<h2>Solution</h2>
<ul>
<li>Meetings were held with the owner of the adjacent Grade II listed building.</li>
</ul>
<ul>
<li>A consultation webpage was set up explaining the benefits of the proposal to as wide an audience as possible.</li>
</ul>
<ul>
<li>We communicated with existing tenants and key political stakeholders stressing the benefits and deliverability of the proposal.</li>
</ul>
<ul>
<li>We presented the proposals to North Warwickshire Borough Council Planning and Development Board.</li>
</ul>
<ul>
<li>A public exhibition was held to enable key political and community stakeholders along with residents to view the proposals. SP Broadway drafted a Report on Community Engagement submitted with the planning application.</li>
</ul>
<h2>Result</h2>
<p>The Planning and Development Board voted unanimously to approve the application.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/regional-distribution-centre/">Regional distribution centre</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>275 apartments</title>
		<link>https://www.spbroadway.com/case_studies/275-apartments-2/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 19 Jan 2016 06:13:25 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=347</guid>

					<description><![CDATA[<p>Background SP Broadway filled a Neighbourhood Liaison Officer role as part of the planning condition for the redevelopment of Abell House and Cleland House, Westminster SW1 during demolition and construction works. Challenge Liaising with a large number (446) of stakeholder residents from neighbouring buildings during the demolition and construction of two residential apartment buildings. Solution &#8230; <a href="https://www.spbroadway.com/case_studies/275-apartments-2/" class="more-link">Continue reading<span class="screen-reader-text"> "275 apartments"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/275-apartments-2/">275 apartments</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>SP Broadway filled a Neighbourhood Liaison Officer role as part of the planning condition for the redevelopment of Abell House and Cleland House, Westminster SW1 during demolition and construction works.</p>
<h2>Challenge</h2>
<p>Liaising with a large number (446) of stakeholder residents from neighbouring buildings during the demolition and construction of two residential apartment buildings.</p>
<h2>Solution</h2>
<ul>
<li>Acted as a 24/7 single point of contact for external queries – filtering all resident queries to our client. This single point of contact is advertised on the Abell and Cleland House website.</li>
</ul>
<ul>
<li>Managed the distribution of a weekly e-newsletter to all residents outlining the demolition/construction timetable for the forthcoming week. This advance notice of noise, dust and disruption is designed to keep complaints to a minimum and was well received to date, reducing the volume of telephone calls received by the client.</li>
</ul>
<ul>
<li>Co-ordinated and managed a monthly Community Working Group Meeting (CWG) to provide a Steering Group mechanism for key residents and other interested parties during the demolition and construction process. Agendas were circulated by SP Broadway in advance and Minutes were hosted on the project website.</li>
</ul>
<ul>
<li>Managed a tri-monthly Community Liaison Group (CLG) to provide a liaison mechanism for local residents and other interested parties who were less interested in project detail but still wanted to be kept informed of key project milestones. Agendas were circulated by SP Broadway in advance and Minutes were hosted on the project website.</li>
</ul>
<ul>
<li>Organised and attended additional meetings with residents and stakeholders as particular issues developed.</li>
</ul>
<ul>
<li>Managed key community and project team contact databases.</li>
</ul>
<h2>Result</h2>
<p>The development has finished. Residents were kept well-informed and the client was happy.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/275-apartments-2/">275 apartments</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>550 houses</title>
		<link>https://www.spbroadway.com/case_studies/550-houses/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 19 Jan 2016 06:06:11 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=343</guid>

					<description><![CDATA[<p>Background SP Broadway was instructed by a consortium of housebuilders to undertake political and community consultation for proposals to provide 550 homes, land for a new primary school and other amenities in Billingshurst, West Sussex. Challenge Convincing politicians, residents and community representatives of the merits of new development that would enable key improvements to be &#8230; <a href="https://www.spbroadway.com/case_studies/550-houses/" class="more-link">Continue reading<span class="screen-reader-text"> "550 houses"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/550-houses/">550 houses</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>SP Broadway was instructed by a consortium of housebuilders to undertake political and community consultation for proposals to provide 550 homes, land for a new primary school and other amenities in Billingshurst, West Sussex.</p>
<h2>Challenge</h2>
<p>Convincing politicians, residents and community representatives of the merits of new development that would enable key improvements to be made to a deteriorating town centre.</p>
<h2>Solution</h2>
<ul>
<li>Briefing meetings were held with county, district and parish councillors informing them of the proposals and ensuring they understood the benefits.</li>
</ul>
<ul>
<li>We held a public exhibition over two days. Results showed a broadly positive approach to the development with 50% stating that they supported the principle of planned development in Billingshurst, which would bring with it a package of community benefits.</li>
</ul>
<ul>
<li>SP Broadway organised three Community Liaison Group (CLG) meetings prior to submitting the planning application. The group kept residents up to date on the proposals and provided a forum for community concerns.</li>
</ul>
<h2>Result</h2>
<p>SP Broadway was able to ensure residents, stakeholders and political leaders were aware of the proposals and had a clear understanding of the benefits. We acted as a first point of contact for residents, political, community and media stakeholders and built a solid communication base. The local MP remarked that he thought the consortium’s engagement <em>&#8220;very comprehensive&#8221;</em>.</p>
<p>Although Horsham District Council rejected the application for 550 homes, a revised application for 475 homes – with an extra £1.72m of community investment in lieu of a 5% reduction in affordable housing – was approved.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/550-houses/">550 houses</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>203 houses</title>
		<link>https://www.spbroadway.com/case_studies/203-houses-3/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 27 Jan 2016 11:41:19 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=711</guid>

					<description><![CDATA[<p>Background SP Broadway was asked to provide political and community relations support for a small niche housebuilder to gain an allocation in the emerging Thame Neighbourhood Plan. Challenge As one of the first Neighbourhood Plans in the UK, SP Broadway was brought on board to work out where power lay within the process and to &#8230; <a href="https://www.spbroadway.com/case_studies/203-houses-3/" class="more-link">Continue reading<span class="screen-reader-text"> "203 houses"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/203-houses-3/">203 houses</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>SP Broadway was asked to provide political and community relations support for a small niche housebuilder to gain an allocation in the emerging Thame Neighbourhood Plan.</p>
<h2>Challenge</h2>
<p>As one of the first Neighbourhood Plans in the UK, SP Broadway was brought on board to work out where power lay within the process and to establish links with those making the political running. We spent important time in research and gained key information on the key local &#8216;movers and shakers&#8217; from the MP. It was important to liaise with the key driver of the Neighbourhood Plan, Thame Town Council, who were concerned about a single large development site and who preferred a dispersed approach to new housing.</p>
<h2>Solution</h2>
<ul>
<li>SP Broadway identified a Housing Working Group within the town council, which proved to be the key advisory and delivery mechanism throughout the Neighbourhood Plan process; as well as identifying key political stakeholders and advisers to the town council.</li>
</ul>
<ul>
<li>We met with local residents’ associations to understand their concerns regarding development in specific areas and to highlight the many benefits of an allocation on our site.</li>
</ul>
<ul>
<li>We supported a presentation to Thame Town Council on behalf of the client team.</li>
</ul>
<ul>
<li>We undertook briefings and wrote a series of key letters to inform political and community stakeholders.</li>
</ul>
<h2>Result</h2>
<p>Our site was allocated 203 homes in the Referendum, with 2,779 residents in Thame voting in favour of adopting the Neighbourhood Plan.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/203-houses-3/">203 houses</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Shopping centre extension</title>
		<link>https://www.spbroadway.com/case_studies/shopping-centre-extension/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 27 Jan 2016 12:43:06 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=551</guid>

					<description><![CDATA[<p>Background SP Broadway was asked by two pension funds to provide political, community and media relations support to secure planning permission to increase the retail footprint of their out-of-town shopping centre in Medway, Kent by 21,500 sq ft in 2010 and again in 2012/13 for a similar amount of A3 space. Communications Challenge The communications &#8230; <a href="https://www.spbroadway.com/case_studies/shopping-centre-extension/" class="more-link">Continue reading<span class="screen-reader-text"> "Shopping centre extension"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/shopping-centre-extension/">Shopping centre extension</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>SP Broadway was asked by two pension funds to provide political, community and media relations support to secure planning permission to increase the retail footprint of their out-of-town shopping centre in Medway, Kent by 21,500 sq ft in 2010 and again in 2012/13 for a similar amount of A3 space.</p>
<h2>Communications Challenge</h2>
<p>The communications challenge posed problems from a community perspective: the scheme saw a decrease in on-site parking in a very residential neighbourhood. Political complications were added through the ward councillor also being Council Leader, and his wife chairing the Planning Committee: clearly without their joint support we would struggle.</p>
<h2>Solution</h2>
<ul>
<li>SP Broadway briefed the local residents’ association and key political stakeholders to understand the level of community support and identify key issues of concern.</li>
</ul>
<ul>
<li>A public exhibition was held which attracted 1, 576 members of the public over two days. SP Broadway analysed 118 feedback forms, and established 92% support.</li>
</ul>
<ul>
<li>We used residents’ feedback to refine the scheme and turn constructive criticism into positive support, organising a pre-committee briefing to members in association with council officers.</li>
</ul>
<h2>Result</h2>
<p>After successful pre-committee briefings, including a meeting with the Ward Councillor/ Council Leader, the first scheme was consented. After further political briefings, a subsequent planning application for A3 use was consented by 13 votes to 1.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/shopping-centre-extension/">Shopping centre extension</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>71 houses</title>
		<link>https://www.spbroadway.com/case_studies/71-houses/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 27 Jan 2016 12:12:55 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=535</guid>

					<description><![CDATA[<p>Background Our client was seeking to build 71 homes on 7 acre site to the north of Cam, Gloucestershire, a large working village near the Severn estuary. Challenge The site lay outside the defined settlement boundary of Cam, and Stroud District Council claimed that it already had a 5-year supply of housing land. Solution Taking &#8230; <a href="https://www.spbroadway.com/case_studies/71-houses/" class="more-link">Continue reading<span class="screen-reader-text"> "71 houses"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/71-houses/">71 houses</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>Our client was seeking to build 71 homes on 7 acre site to the north of Cam, Gloucestershire, a large working village near the Severn estuary.</p>
<h2>Challenge</h2>
<p>The site lay outside the defined settlement boundary of Cam, and Stroud District Council claimed that it already had a 5-year supply of housing land.</p>
<h2>Solution</h2>
<ul>
<li>Taking a ‘bottom up’ approach to political consultation, we met first with the appropriate ward members on Cam Parish Council, followed by members of Stroud District Council including the Chairman of the Planning Committee.</li>
</ul>
<ul>
<li>We impressed upon them that the proposed homes, although outside Cam’s settlement boundary, would have little impact on the character of the area, were in a suitable location to integrate with the community, and were a deliverable addition to the housing supply.</li>
</ul>
<h2>Result</h2>
<p>Although Stroud District Council Planning Committee rejected the proposal, our client won consent on appeal.</p>
<p>In his ruling, the Planning Inspector agreed that the proposal would cause <em>‘limited harm to the character and appearance of the area’</em>, was <em>‘broadly compatible with the…aim of locating development in sustainable locations’</em>, and that Stroud District Council was ‘<em>unable to demonstrate a 5 year supply of housing land’.</em></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/71-houses/">71 houses</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Wind farm</title>
		<link>https://www.spbroadway.com/case_studies/wind-farm-application/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 27 Jan 2016 10:18:49 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=504</guid>

					<description><![CDATA[<p>Background An energy company was seeking to gain consent on a 4-turbine wind farm near Milton Keynes in Buckinghamshire. SP Broadway was brought on board to undertake political and community consultation to ensure our client&#8217;s application complied with consultation best practice. Challenge The proposals were opposed by a dedicated and vocal group of local residents. &#8230; <a href="https://www.spbroadway.com/case_studies/wind-farm-application/" class="more-link">Continue reading<span class="screen-reader-text"> "Wind farm"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/wind-farm-application/">Wind farm</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>An energy company was seeking to gain consent on a 4-turbine wind farm near Milton Keynes in Buckinghamshire. SP Broadway was brought on board to undertake political and community consultation to ensure our client&#8217;s application complied with consultation best practice.</p>
<h2>Challenge</h2>
<p>The proposals were opposed by a dedicated and vocal group of local residents.</p>
<h2>Solution</h2>
<ul>
<li>SP Broadway initially met with Councillors and Parish Council representatives from the six villages that neighbour the site, following these initial briefings SP Broadway drafted and sent out a letter of invitation to a public exhibition to 2961 residents, retail and commercial premises.</li>
</ul>
<ul>
<li>Throughout the project we liaised with supportive local residents.</li>
</ul>
<ul>
<li>We hosted an exhibition with a total of 268 residents recorded in attendance. 138 feedback forms were completed and most of those who did – 55.07% &#8211; said they were either supportive or very supportive of renewable energy. 43.47% of people also said that they were either supportive or very supportive of wind power. The exhibition boards were subsequently placed on a special Wind Farm website, set up at SP Broadway’s urging.</li>
</ul>
<h2>Result</h2>
<p><em>Meteorological mast application</em></p>
<p>Our client submitted an application to erect a temporary meteorological mast to test wind speed prior to the main turbine application. To aid the application SP Broadway drafted and circulated a letter to all Councillors on the Aylesbury Vale District Council Development Control Committee, explaining about the specifics of the met mast and why Councillors ought to support its construction. Despite intense lobbying, councillors voted to support the application.</p>
<p><em>Wind farm application</em></p>
<p>The Aylesbury Vale District Council Strategic Development Control Committee met to decide on the application: the first of many wind turbine applications in the Aylesbury Vale area.</p>
<p>The decision split along party lines with the Conservative majority (6) supporting Officers’ recommendations on landscape, residential amenity and access grounds; and Lib Dem councillors (3) seeking to overturn the Officers’ recommendation.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/wind-farm-application/">Wind farm</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>New food store</title>
		<link>https://www.spbroadway.com/case_studies/new-food-store/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 27 Jan 2016 12:31:01 +0000</pubDate>
				<guid isPermaLink="false">http://www.spbroadway.com/?post_type=case_studies&#038;p=543</guid>

					<description><![CDATA[<p>Background SP Broadway was instructed by a food-led commercial development company to undertake a concise programme of political and community consultation to support the redevelopment of a site on the outskirts of Petersfield to house a 40,000 sq ft supermarket, along with a relocation of the existing fencing factory (and jobs) to an out-of-town location. &#8230; <a href="https://www.spbroadway.com/case_studies/new-food-store/" class="more-link">Continue reading<span class="screen-reader-text"> "New food store"</span></a></p>
<p>The post <a href="https://www.spbroadway.com/case_studies/new-food-store/">New food store</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Background</h2>
<p>SP Broadway was instructed by a food-led commercial development company to undertake a concise programme of political and community consultation to support the redevelopment of a site on the outskirts of Petersfield to house a 40,000 sq ft supermarket, along with a relocation of the existing fencing factory (and jobs) to an out-of-town location.</p>
<h2>Challenge</h2>
<p>Set within a built-up residential area, and with Waitrose already established in the town centre, concern was raised among residents and politicians over the negative impact the change-of-use might have on residents in neighbouring streets.</p>
<h2>Solution</h2>
<ul>
<li>SP Broadway prepared a Political and Community Stakeholder Survey identifying the political makeup of Petersfield and East Hampshire, which enabled us to devise a political and community engagement strategy to understand the level of community support and key issues of concern.</li>
</ul>
<ul>
<li>Applying a &#8216;bottom-up&#8217; approach, we held a series of one-to-one meetings with key political and community stakeholders at town, district, county and parliamentary level to understand their views.</li>
</ul>
<ul>
<li>We hosted a two-day public exhibition, with over 300 people attending and 164 filling in feedback forms.</li>
</ul>
<ul>
<li>76.2% of people supported the principle of the factory moving to secure its future and protect local jobs. This statistic was vital in gaining political and community support.</li>
</ul>
<h2>Result</h2>
<p>Across-the-board stakeholder communications &#8211; meetings with residents, political briefings, the public exhibition and liaison with newspaper editors &#8211; established widespread support for the factory&#8217;s move to new purpose-built premises,&#8217;opening up&#8217; a retail opportunity in the area.</p>
<p>The post <a href="https://www.spbroadway.com/case_studies/new-food-store/">New food store</a> appeared first on <a href="https://www.spbroadway.com">SP Broadway</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
